Posted:15 hours ago| Platform:
On-site
Full Time
Key Functional Areas & Roles Responsibilities: · Plan, organize, and supervise the entire furniture manufacturing process. · Manage production schedules and meet delivery timelines. · Allocate resources, assign tasks, and oversee daily operations across woodworking and metalworking units. · Coordinate with the design, procurement, and sales teams for smooth workflow. · Monitor key performance indicators (KPIs) like output rate, defect rate, and downtime. · Create daily/weekly/monthly production plans based on sales orders and capacity. · Track progress and update production dashboards. · Prioritize jobs based on urgency and resource availability. · Coordinate with inventory and procurement to ensure material readiness. · Identify bottlenecks and recommend workflow optimizations. Responsibilities: Supervise carpentry processes including cutting, pressing, edge banding, boring, assembling, of wooden furniture. Ensure proper use of machines like panel saws, CNC routers, edge banders, etc. Maintain wood stock inventory and minimize waste. Train and manage skilled carpenters and machine operators. Ensure product dimensions and finishes match design specs. Review drawings for manufacturability. Confirm raw material availability and quality. Ensure clarity on product specs, customization, and deadlines. Coordinate packaging and delivery schedules. Assemble wooden and MS furniture components into final products. 1. Production Planning & Job Control Production Plan / Master Schedule Daily or weekly job-wise plan with timelines and priorities. Job Card / Work Order Sheet For each item or batch; includes design reference, material, finish, hardware. Machine Allocation Sheet (if applicable) Schedule for CNC, edge banding, welding, powder coating, etc. Process Flow Tracker Follows the product through various stages: cutting → assembly → finishing → QC. 2. Technical Documents Approved Working Drawings / Production Drawings From the design team with dimensions, materials, joinery details. Cutting List / Panel Optimization Sheet For board cutting (for wooden items). Metal Fabrication Drawings For MS structures, frames, legs, supports, etc. Hardware List (per product) Quantity, brand, finish (e.g. hinges, drawer channels, locks). 3. Material Coordination Material Requisition Sheet (MR) Sent to the store or purchase department based on job cards. Material Consumption Report Quantity of raw material used per item/job. Balance Material & Scrap Register Leftover panels, MS, edge tape, or hardware. 4. Quality Control & Inspection In-Process QC Checklist During cutting, assembly, finishing, etc. Final QC Report Before packing, based on design, finish, hardware fitting, and labeling. Non-Conformance Report (NCR) For defects, mismatches, or reworks. Rectification Log Tracks repair or rework actions with root cause noted. 5. Packing & Dispatch Coordination Packing List (Item-wise) With dimensions, item code, finish, and assigned labels. Dispatch Handover Sheet Confirms items packed and sent to site or warehouse. Balance to Dispatch Tracker What’s left to be packed and sent. 6. Coordination & Communication Daily Production Progress Report Shared with management, design, and project coordinator. Delay Reason Log Captures reasons like design delay, material shortage, machine breakdown. Design Clarification Register For pending inputs from design or project teams. 7. Productivity & Efficiency Operator / Team-wise Productivity Tracker For evaluating time spent and output per team or machine. Machine Maintenance Log Daily/weekly record of machine checkups and servicing. Daily Attendance Sheet (if labor is under production) Job Type: Full-time Pay: ₹30,000.00 - ₹35,000.00 per month Application Deadline: 21/06/2025
Zen Furniture
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
My Connections Zen Furniture
Ghaziabad
3.5 - 4.5 Lacs P.A.
India
Experience: Not specified
0.3 - 0.35 Lacs P.A.
Experience: Not specified
0.45 - 0.45 Lacs P.A.
Experience: Not specified
0.25 - 0.35 Lacs P.A.
Mumbai Suburban, khar west, bandra west
3.0 - 6.0 Lacs P.A.
0.3 - 0.35 Lacs P.A.
30.0 - 35.0 Lacs P.A.
Ahmedabad
5.0 - 8.5 Lacs P.A.
Dera Bassi
0.42 - 0.45 Lacs P.A.
Bawal
3.0 - 5.0 Lacs P.A.