Posted:11 hours ago|
Platform:
On-site
Full Time
The Designing, Costing & Proposal Engineer will be responsible for designing treatment systems, preparing cost estimates and developing technical proposals for water and wastewater treatment projects. This role requires a strong understanding of process design, cost analysis and proposal preparation to support sales and project execution. Key Responsibilities: Design & Engineering: Develop & update process flow diagrams (PFDs) and piping & instrumentation diagrams (P&IDs) for water treatment systems. Select and size equipment such as pumps, membranes, filters and chemical dosing systems based on project requirements. Ensure designs comply with industry standards, environmental regulations and client specifications. Proficiency in AutoCAD Good Knowledge of water treatment technologies (RO, UF, MBR, STP, ETP, etc.). Expertise in designing WTPs, WWTPs for Domestic as well as Industrial applications Preparing plant as well as equipment layout for WTP as well as WWTPs Thorough knowledge on type of MEP equipment & Material Visiting Customers, their engineering team for discussing treatment philosophy and provide solutions as and when need arises Cost Estimation & Pricing: Prepare detailed cost estimates for water, wastewater treatment plants & other plants. Evaluate vendor quotations, material costs and labour charges to ensure competitive pricing. Improve design and equipment selection to balance performance and cost-effectiveness. Proposal & Documentation: Develop technical and commercial proposals, including scope of work, specifications and pricing. Prepare bid documents and respond to tenders in collaboration with the sales team. Coordinate with cross-functional teams (procurement, sales and project management) to finalize proposals. Ensure that the timelines for submitting proposals to clients are adhered to (as per attached annexure). Client & Vendor Coordination: Communicate with clients to understand project requirements and provide technical support. Collaborate with vendors and suppliers for equipment selection and cost negotiation. Conduct site visits and assessments when necessary. Soft Skills: Good Communication skills Managerial skills, people management Strengthening DCP Department Punctuality Go Getter Approach Ability to listen to details Should Possess a Positive Attitude Should have an excellent understanding of Project & its commercial aspect. Should be able to communicate effectively about commercial aspects of the project with internal & external customers. Should Have a Clarity of Thoughts Annexure Sr.# Description / Type of System Business Vertical No. of Working Days from the day of entry in CRM Remarks 1 Standard Offer WWTP EWD 01 day These are standard formats available in FDIPL Library 2 Detail BOQ, Excel WWTP Upto 500 KLD EWD 03 days DCP to understand the entire proposal / Client requirement , make notes and connect with vendors where the rates are not available 3 Detail BOQ, Excel WWTP > 500 KLD 2 MLD EWD 07 days 500 KLD~2 MLD = 7 days Detail BOQ, Excel WWTP Above 2 MLD 12 Days Above 2 MLD = 10-12 Days 4 EWD Out of India Proposals WWTP EWD 14 days --Do-- 5 Water Filters & Softening Plants / Ion Exchange Process EWD 03 days --Do-- 6 RO upto 4P to 5 m3/hr EWD 07 days --Do-- 7 Complete Solution (CS) For Villa Project WTP HPN HWG EWD 03 days --Do-- 8 Swimming Pools up to 1600mm Dia Filters with Heating & Water Massage Systems SPD 02 days Design Standardization to be done, extract the data from CRM 4 days Pool with water 9 Pools > 1600mm Dia Filters with heating SPD 04 days Non Standard items to be evaluated, DCP to have rates / vendors for all Such items with complete details 10 HWG For large projects EWD 07 days DCP to keep standard products , tanks pricing ready 11 Pumping Solutions EWD 04 days DCP to have rapport with all vendors for quick response 12 Tenders (Private / Gov) EWD/ SPD 07 days or as per Req. DCP to have well defined process for civil work costing & to have vendor data base for large equipment For Tender, all costing to be submitted 2 days For Tender, all costing to be submitted 2 days prior to last date to management 13 Service Contract Proposals SBU-CBU 04 days Depending on project size DCP to quickly work on proposals with set formulae on consumable consumption etc. 14 Repairs Proposal SBU-RBU 07 Days DCP to understand the job, if need be visit the site
Job Type: Full-time
Pay: ₹11,583.93 - ₹47,011.96 per month
Work Location: In person
Go-work Placement Services
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
Experience: Not specified
Salary: Not disclosed
Salary: Not disclosed
1.8 - 2.64 Lacs P.A.
Experience: Not specified
1.8 - 4.2 Lacs P.A.
Salary: Not disclosed
1.8 - 7.2 Lacs P.A.
mumbai, maharashtra, india
2.0 - 10.0 Lacs P.A.
Salary: Not disclosed
rajkot, gujarat
Salary: Not disclosed
ahmedabad
2.5 - 4.0 Lacs P.A.