Job Purpose
Responsible for supervision of mining operations in shift to ensure targeted production with safety of men & machinery. Coordinate with contractors for deployment of their machinery in line with Safety compliances.
Qualification:
Diploma In Mining.
Certification:
Mining Mate Certificate/ Foreman Certificate.
Job Context & Major Challenges
Job Context: UltraTech Cement Ltd. is the largest manufacturer of grey cement, Ready Mix Concrete (RMC) and white cement in India. The company has consolidated capacity of 138.39 Million Tons Per Annum (MTPA)* of grey cement. UltraTech Cement has 23 integrated plants, 1 clinkerisation plant, 29 grinding units and 8 bulk terminals.Baga Cement Works was acquired by UltraTech Cement Limited from erstwhile M/S Jaiprakash Associated Limited in the year 2017. Baga Cement Works is located at around 155 Km from Chandigarh, 67 km from Shimla and 37 km from Bilaspur (HP). The nearest National Highway is NH-88 which is 17 Km from the plant. The plant has 10,000 TPD clinker production capacity & 250/300 TPH OPC/PPC cement grinding capacity. The preheater consists of four strings, each with 6 stages of LP cyclones, with two pyroclones supplied by M/s KHD. This is a unique feature of this cement plant due to which the plant operates at lower heat and electrical energy. The preheater has a height of 155 mtrs, with top floor at 135 mtrs. The preheater has been constructed out of tubular steel structure.The Cement Plant is based on lime stone deposits in Baga – Bhalag hills which are adjacent to plant area. Limestone requirement of the plant is around 15000 TPD. For raw material grinding, two vertical roller mills of 420 TPH each have been installed with a C.F. Silo having a capacity of 24,000 MT.The unit is equipped with state-of-the-art pollution control systems, and operating emission norms are much lower than the permissible standards of 30 mg/Nm3. Two continuous ambient air quality monitoring stations have been installed which are hooked up to CPCB and PCB and transmit real time data's.For emergency electrical power, 8 x 1800 KVA, DG sets have been installed.The township for the plant is located near the plant and has a residential complex for 300 families. 10+2 school and 30 bed hospital has been built. For transporting clinker and cement from plant a fleet of about 4000 trucks have been engaged.
Major Challenges
Deployment of drill as per quality requirement.
Ammonium Nitarte fuel oil manufacturing, blast holes charging, blast firing.
Compliance of all PPEs and other statutory requirement to ensure SAFETY.
Key Result Areas
KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1 Blasting Drill holes marking as per plant quality requirementDrill face preparationResponsible for safe operation of blasting activities.Preparation of daily reports as per requirement under explosive and ammonium nitrate rulesKRA2 Quality Management Execute blasting as per quality requirement.KRA3 Statutory Compliance Implementation of compliances as per guidancePreparation of Daily register as per statutory requirement.Maintaining competetant person recordKRA4 SHE (Safety, Health & Environment) along with Sustainability initiatives Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.Educating team about “I know my job”, “I know the hazards associated with my job and I applied control measures” & “I escalate to my senior” among manpower deployed in sections/department manpower including peer, WB & CL manpowerReporting of accidents, incidents and near misses on occurrences in the area of concern in system.To conduct daily Tool Box Talk as schedule and before start the job any critical job along with SWPActive participation in safety training, safety sub committees, standard champions meeting and any safety eventEnsure good housekeeping, limited use of power, no leakage of water, oil, air etc and reporting concerned if any abnormalities for corrective actionAdhering of all safety precautions on the site and off the siteReplicating good practice for saving environment for long run sustainability and creating awareness among manpower to save guard natural resources.KRA5 System Management(Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards) To implement improvement project to reduce repetitive problems/breakdown or losses.Timely submission of Kaizen, OPL, Good to fine, suggestion on systemDeveloping and sustaining Model area in respective sections100% active participation in respective KFA & GRT meetings and giving inputs related to bring new technology, innovation and improvements towards productivity. Conduct awareness programmes down the level teamTo know about IMS and other systems requirement and documents for Non-Conformity in section during internal and external audits or assessments.Implementation of critical spares & consumable SOP without any defilementIdentify & arrange rectification of leakage points/unsafe points along with monitor & take corrective action for emission levels.