SKILLS AND KNOWLEDGE
  
   Educational Qualifications
  
  -   Bachelor of Engineering (Electrical)  
-   Additional Qualification: - Post Graduation in Project/ Construction Management will be preferred  
  Functional Skills
  
  -   Strong knowledge of solar panel installation, mounting structures, inverters, and electrical systems  
-   Familiarity with relevant regulations, codes, and standards in solar energy  
-   Experience in managing and supervising teams of engineers, technicians, and contractors  
-   Excellent communication and interpersonal skills, with the ability to work effectively in a team environment  
-   Strong analytical and problem-solving skills, with the ability to troubleshoot technical issues on site  
-   Proficient in Microsoft Office and project management software  
  Relevant and total years of Experience
  
  -   Overall experience: 10 years   
-   Minimum of 8 years of experience in solar project installation and management  
 
   PRINCIPAL ACCOUNTABILITIES
  
  
   Accountabilities
  
  Major Activities
   -   Supervise the installation of solar panels, inverters, mounting structures, and other equipment on site.  
-   Ensure that all work is carried out safely and in accordance with relevant regulations and company policies.  
-   Monitor project progress and ensure that it is completed on time and within budget.  
-   Work closely with other engineers, technicians, and contractors to ensure that the project is delivered to the required quality standards.  
-   Conduct site inspections and tests to ensure that the solar system is operating correctly and efficiently.  
-   Prepare reports and documentation on project progress and technical specifications.  
-   Liaise with customers and stakeholders to ensure that their needs and requirements are met.  
-   Manage and supervise the work of other engineers, technicians, and contractors on site.  
-   Post erection/ installation complete the inspection and testing checklists mentioning the observations, if any. In case of major observations/ Defects, notify site management and issue Quality NCRs/ Observation reports to EPC Partners and subsequent follow-ups to get the detects/ observations cleared.  
-   Witness of testing and pre-commissioning/ commissioning activities.  
 -   Supervise the Erection/ Installation, Testing & pre-commissioning/ Commissioning activities of the following as per SOP & FQP:  
-   Transmission Line works, e.g. Tower Foundation/ Erection, Stringing of Conductors & OPGW.  
-   PSS Erection & Installation works: Structure & Equipment Erection, Main Power Transformer & Auxiliary Transformers Erection, Laying of Bus Bar, Power & Control Cables, Termination of Cables at various Equipment s e.g., Circuit Breakers, Isolators, Earth Switch, Current Transformer, Potential Transformer, Main Power Transformers along with NIFPS, Earthing Material, Conductor, OPGW, Insulators & hardware.  
-   Main Control Room: Installation of Control & Relay Panels, 33kV Switchgear, SCADA Panels, Auxiliary Transformers, Battery Bank, ACDB, DCDB, LDB, etc. Cable Laying & Termination as per cable schedule.  
-   Solar PV Area: Laying of AC & DC Cables as per Cable Schedule, Installation & connections of Solar panels, String DC Connections to SMB and Inverters, Cable laying & Termination at Inverter Duty Transformer, RMU Panels (Switchgear), laying of earthing grid & Lightening Arrestors.  
 
  -   Inspection & Validation on Receipt of the following:  
-   Solar Project Materials: Solar Panels, String Monitoring Boxes, Inverter, Inverter Duty Transformer, RMU Panels (Switchgear), AC/ DC Cables & Accessories kit, Lightening Arrestors, Earthing Material.  
-   Transmission Line Materials: Stub & Tower materials, Earthing Material, Conductor, OPGW, Insulators & hardware.  
-   PSS Equipment/Materials: Foundation Stubs & Structure Material, Bus Bar, Circuit Breakers, Isolators, Earth Switch, Current Transformer, Potential Transformer, Main Power Transformers along with NIFPS, Earthing Material, Conductor, OPGW, Insulators & hardware.  
-   Main Control Room Equipment/Materials: Control & Relay Panels, 33kV Switchgear, SCADA Panels, Auxiliary Transformers, Battery Bank, ACDB, DCDB, LDB, etc.  
-   Post Inspection complete the inspection checklist mentioning the observations, if any. In case of major observations/ Defects, notify site management and issue Quality NCRs/ Observation reports to EPC Partners and subsequent follow-ups to get the detections/ observations cleared.  
  HSSE  
  -   Provide inputs to Project Management team on HSSE aspect observation to Project Management team.   
-   Make observations of safety non-conformance for each contractor. Conduct discussions with contractors about safety improvements.  
 
  -   Ensure PPE compliance at site as per agreed stranded   
-   Ensure and adhere the PTW system during project phase  
-   Attend and conduct the TBT and Sunset meetings.  
-   Any safety non-compliance at site, bring immediate attention to Project Management team.  
-   Ensure LTI free site during project phase.