Posted:2 weeks ago|
Platform:
On-site
Full Time
To understand the details of the project as per air flow and control diagram for all systems. To verify HVAC related material that are available at site & compare the same with the packing list. To prepare a report indicating the discrepancy to the Project Manager at site, if any, with reference. To check all the construction drawings with respect to site conditions. To highlight issues and problems related to quality, workmanship,if any, to the Project Manager at site. To coordinate with the Design team through PM team for changes in the construction drawings in alliance with the Project Manager at site. To ensure that no work is executed by the contractor without approved construction drawings. To ensure that the site is equipped with proper utilities and working tools for the team members. To appraise the PM team members & Project Manager at site on the daily work progress & compare the same with the baseline project schedule (tracking the progress). To co-ordinate for the installation of entire HVAC system which includes AHU, ducting, insulation, HEPA boxes, grills, filters, risers, instrumentation, refrigeration piping under the supervision of Project Manager at site. To take reports from the team members on the daily work and highlight issues related to deviation of work with respect to construction drawings and report the same to PM team & Project Manager at site. To verify all the installation done by team members daily and report the same to Project Manager at site. To ensure that the team members are working as per the quality and speed required at site. In case of deviation, report the same to Project Manager at site. To simultaneously generate the as-built drawing and keep on taking acknowledgements from client for completed activity. To follow all the working and safety norms at site as per the requirement. To attend site meetings, if required & as instructed by Project Manager at site, To keep daily track of attendance of the workmen at site and ensure that they work as per the stipulated time. To ensure that the tools and tackles are handled properly and aren’t misplaced at site. To manage installation measurement along with billing of all type of HVAC accessories (All type of duct, & ADP products also) under the supervision of Project Manager at site. To perform leakage testing in AHUs, duct & pressure testing of piping & report the same to Project Manager at site. To witness all activities during validation, balancing and commissioning. To collect raw data from the validation team & submit the same to Project Manager at site.. To review inspection reports and records of quality control carried out on completed and running project activities. Skills & Knowledge: Should be familiar with all detailing work that is required during HVAC duct fabrication and installation. Should be familiar with MS office platforms for report preparation. Should be familiar with installation works of, AHUs, supply boxes, magnehelic gauge, HEPA filters, insulation, instrumentation, BMS. Should be familiar with prevailing HVAC standards including ASHRAE guidelines. Should be familiar with handling contractors at site and allocating work on everyday basis as per the agreed project schedule with proper tools, tackles and drawings. Should be able to understand all construction and execution drawings and should be able to explain the same to team members before job execution. Should be familiar with ACAD detail electrical engineering drawings, which are required for HVAC works. Show more Show less
Lotus Group
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Thane, Maharashtra, India
Experience: Not specified
Salary: Not disclosed
Thane, Maharashtra, India
Experience: Not specified
Salary: Not disclosed