12 - 20 years
12 - 22 Lacs
Posted:22 hours ago|
Platform:
Work from Office
Full Time
1- Quantification of Project Construction Material & Analysis
2- Estimation and Costing of Material Quantities
3- Preparation of BOQ with Specification as per Contractual Requirements
4- Rate Analysis of Material / Activities
5- Review of Design Quantity & Analysis
6- Preparation of Budget
7- Monitoring & Controlling of Cost
8- Preparation, Monitoring and Analysis of Project Schedule
9- Preparation, Monitoring and Analysis of Resources Mobilization
10- Monitoring and Analysis of Progress and Cost
11- Analysis of Tender Vs Actual Cost
12- Analysis of DPR Vs Actual Progress
13- Analysis of Scheduled VS Actual
14- Vendor Management, Negotiation of Rates, Finalization of Contracts, Preparation of Contracts & Specification
15- Checking and Preparation of Bill [Client Billing & Sub-Contractor Billing] as per Drawings
16- Certification of Bills / Measurement
17- Material Reconciliation
18- Project Coordination and Monitoring
19- Preparation of Project Reports Like MIS, Cost VS Expenditure, Cash Flow, Revenue, Reconciliation
20- Tracking, Monitoring and Analysis of Delay, Root Cause of Delay, Preparation of COS, Claims for EOT
Navayuga Engineering Company (NEC)
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
12.0 - 22.0 Lacs P.A.
3.0 - 8.0 Lacs P.A.
nashik, pune, ambah
4.0 - 7.0 Lacs P.A.
ahmedabad
8.0 - 18.0 Lacs P.A.
12.0 - 22.0 Lacs P.A.
mumbai, navi mumbai, mumbai (all areas)
27.5 - 42.5 Lacs P.A.
4.0 - 5.0 Lacs P.A.
bengaluru
30.0 - 45.0 Lacs P.A.
gurugram
11.0 - 15.0 Lacs P.A.
4.0 - 8.0 Lacs P.A.