0 years

2 - 3 Lacs

Posted:1 day ago| Platform: GlassDoor logo

Apply

Work Mode

On-site

Job Type

Full Time

Job Description

· Ensure drawings & BOQ are approved and frozen

· Clarify details with design team

Step 2

· Monitor production floor progress

· Ensure quality checkpoints at:

o Cutting

o Assembly

o Finishing

Step 3

· Record output vs plan

· Identify bottlenecks early

3 – Quality Control

Step 1

· Stage-wise inspection

· Use QC checklist

Step 2

· Rectify defects immediately

· Avoid passing errors to next stage

Step 3

· Final QC before dispatch

· Approve only zero-defect products

4 – Material & Wastage Control

Step 1

· Issue material as per BOQ

· Track daily consumption

Step 2

· Segregate reusable waste

· Record wastage reasons

Step 3

· Implement corrective actions for repeat wastage

5 – Dispatch & Site Installation

Step 1

· Confirm site readiness

· Coordinate dispatch schedule

Step 2

· Assign installation team

· Share drawings & scope clearly

Step 3

· Monitor installation progress

· Resolve site issues quickly

6– Daily & Weekly Reporting

Daily Report (WhatsApp/Sheet)

· Production planned vs achieved

· Manpower deployed

· Quality issues

· Material concerns

· Risks & support needed

Weekly Report

· Projects delivered

· Delays & root causes

· Rework & wastage summary

· Action plan for next week

7– Continuous Improvement

· Review past delays & mistakes

· Improve production workflow

· Train teams on quality standards

· Introduce better tools & practices

�� KRA (Key Result Areas)

1 Production Planning & Scheduling

· Production planning as per project timelines

· Daily and weekly production schedules

· Capacity planning (manpower, machines)

2 On-Time Execution & Installation

· Timely dispatch from factory

· Site installation coordination

· Adherence to committed delivery dates

3 Quality Control & Rework Reduction

· Quality checks at every stage

· Final finish inspection

· Minimizing defects and rework

4 Material, Inventory & Wastage Control

· Material planning as per BOQ

· Inventory tracking

· Zero wastage implementation

5Manpower & Vendor Management

· Carpenter / technician allocation

· Vendor coordination

· Productivity tracking Step 1 — Morning Review (9:00 AM)

· Review ongoing projects

· Check today’s production targets

· Check manpower availability

· Review material readiness

Step 2 — Daily Production Plan

· Allocate work to teams

· Set output targets

· Communicate priorities clearly

Job Type: Full-time

Pay: ₹20,000.00 - ₹30,000.00 per month

Benefits:

  • Health insurance
  • Provident Fund

Work Location: In person

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now

RecommendedJobs for You