What we're looking for
We are seeking an experienced EAI Engineer (FDS) to support our team from the design and engineering of plant electrical distribution infrastructure through to installation and commissioning. This role involves technical specification writing, equipment sizing, vendor selection support, and ensuring the seamless execution of EAI deliverables for EPC industrial projects, with a strong emphasis on safety and quality.
Key Responsibilities:
The EAI Engineer-FDS will:
- Support the team from the design/engineering of plant electrical distribution infrastructure.
- Support end-users for supplier selection from a technical standpoint.
- Support during installation and commissioning processes.
- Support the Energy/Utilities Design Manager in writing technical specifications, sizing of equipment (calculation notes), etc., including distributing and defining the scope of services.
Key Deliverables & Expertise:
- Experienced in Engineering, Procurement, and Commissioning of Electrical Infrastructure of factories, including sizing of electrical equipment, cables, and execution of engineering tasks related to design, transformers, and other required electrical equipment.
- Experienced in the preparation of the following (but not limited to) Electrical, Automation, and Instrumentation (EAI) Engineering deliverables:
Electrical Load List
Power Distribution Single-Line Diagrams
Electrical Interconnection Diagrams
Power and Signals Cable Schedule (list)
- Electrical equipment layout (support)
- Cable Tray Schedule and Layout
- Electrical Installation Drawings
- Electrical Panels (Cabinets) Schedule and GA validation
- Electrical Equipment Datasheets
Automation Architecture
Process Instrumentation Diagrams (PIDs)
development for general Utilities services.Instruments list
is a must, and understanding different types of instruments.- Experienced in Factory Automation and Process Control Systems and the implementation of their resource applications, Standards, Specification, Codes, and Regulations as per John Cockerill group strategies.
- Experienced in complying with all Safety Environment regulations (Internal & External) and applicable John Cockerill standards.
- Experienced in collaborating with internal resources, external vendors, and external subcontractors through defined distribution and scope of services.
- Experienced in working with pre-project engineers, project teams, other specialist engineers, and other stakeholders such as customers and suppliers.
- Experienced in executing the basic and detailed design of utilities based on standards, local regulations, and the defined User Requirements Specifications of a unit operation (safety, quality, affordability, maintainability, and reliability).
- Experienced in ensuring that the engineering side of the project is implemented in accordance with the defined timing, cost, and quality.
- Experienced in ensuring elements of the project (including technical people training, as needed) are performed in such a way that safety is always guaranteed on the whole project site and that a vertical start-up is assured. Ensure that John Cockerill standards are applied.
- Experienced in supporting the preparation and distributing of the engineering project documentation, including the engineering part of the project.
Additional Tasks:
During the pre-project (feasibility study) phase:
- Reading and understanding end-user/customer requirements and specifications.
- Considering local regulations and the specific needs arising from them.
- Supporting the Energy/Utility Manager to prepare basic study documents (Load List, Motors & Instruments list, I/O list, Power Supply SLD, power and control cables preliminary lists, etc.).
- Supporting the preparation of supplier consultation files (Technical Specs, Datasheets, Technical Bid Evaluations), enabling proper technical documentation for
RFQ (Request For Quotations)
. - Planning for optimum equipment/facilities to meet the established objectives of the business.
During the project execution phase:
- Implementation as per end-user/customer requirements and specifications.
- Considering local regulations and the specific needs arising during the execution.
- Follow-up of work with subcontractors, supplier schedule, technical specifications, and clarifications.
- Resolve technical problems related to Electrical, Automation, and Instrumentation during the execution phase.
- Implementation of Industry Best Safety Practices during the execution of the project.
Required Skills & Qualifications:
- B.E/B.Tech in Electrical / Automation Engineering.
Experience:
8-10 years of experience in the field of Plant EAI (Electrical, Automation, Instrumentation) - EPC industrial projects.- Working experience in turnkey projects will be an added advantage.
- Knowledge of electrical power distribution and automation drawings and documentation.
- Able to take initiatives, and work in a team with multiple interfaces related to various areas of expertise.
- Willing to travel abroad for project work on short notice.
- Must be ready and accustomed to work with international stakeholders.
- Experience in Best Industrial Safety Practices during execution of a project.
- Working knowledge of Plant Electrical Distribution and Plant Automation. Plant instrumentation is a plus.
- Fluent in English (strong written, verbal, and proven presentation).
Technical Skills (a plus):
- Mechanical understanding of Plant general Utilities (Compressed Air, Steam, Water, etc. networks) is a great added-value.
- I/Os list is a plus.
- Instruments selection is a plus.
- Earthing/Grounding specification layout.
- Lighting Layout Looping diagrams is a plus.
Soft Skills:
- Team player, open mindset.
- Information sharing - Collaboration.
- Autonomous profile, able to work from a blank page - Flexible.
- Good communication skills, both verbal and written.
- Problem-solving, able to take initiatives.
- Schedule oriented, priority management, rigorous.
- Comfortable with international contacts and relationships.
- Ability to work under pressure, capable of working in a fast-growing environment.