Posted:6 hours ago|
Platform:
Work from Office
Full Time
Zero CB leakage at Site - Identification of carbon, Utility leakages from different sources.
Achieve Maintenance conversion cost as per budget
CAPEX Implementation within budget and timeline.
Leak Mapping and timely completion of identifying leaks.
Planning and execution of quality work in time- DCS System and Configuration
PLC System and Configuration,
Instrumentation- P&ID PFD,Power Plant Operation (Turbine)- CPP,
Field Instruments Calibration,
Flow Measuring equipment,
Pollution Monitoring Equipment
OCP Implementation,
Auto Packers etc
Execution of Capex activities as per scheduled timeline.
Aligning new joinee’s and inputs for ensuring their readiness at the earliest.
Sarthee Consultancy
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
4.0 - 8.0 Lacs P.A.
guwahati
3.0 - 6.0 Lacs P.A.
Experience: Not specified
0.5 - 0.5 Lacs P.A.
5.4 - 7.2 Lacs P.A.
bengaluru
0.5 - 1.0 Lacs P.A.
bengaluru, karnataka, india
Salary: Not disclosed
chandigarh
7.0 - 9.0 Lacs P.A.
4.2 - 4.8 Lacs P.A.
Experience: Not specified
3.6 - 10.8 Lacs P.A.
uttar pradesh
Salary: Not disclosed