Posted:1 day ago|
Platform:
Work from Office
Full Time
EXPERIENCE IN POWER PLANT (AFBC BOILER AND BOILER LIGHT UP AND SHIFT HANDLING) Mechanical Knowledge Plant Monitoring overseeing the Mech. operations of the power plant during their assigned shift, ensuring safe and efficient operation of the plant
Arya Energy
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
3.0 - 3.96 Lacs P.A.
Salawas, Rajasthan
3.0 - 3.96 Lacs P.A.
Salawas, Rajasthan
Experience: Not specified
0.25 - 0.33 Lacs P.A.
CV Raman Nagar, Bengaluru/Bangalore
Experience: Not specified
2.16 - 5.28 Lacs P.A.
Hyderabad, Jaipur, Mahabubnagar
2.5 - 4.0 Lacs P.A.
Phalodi
4.8 - 5.4 Lacs P.A.
Chandrapur
3.5 - 6.0 Lacs P.A.
Jhagadia
2.0 - 6.0 Lacs P.A.
Jhagadia
2.0 - 6.0 Lacs P.A.
Oragadam, Chennai, Kanchipuram
7.0 - 9.0 Lacs P.A.