4 - 6 years

7 - 12 Lacs

Posted:1 day ago| Platform: Naukri logo

Apply

Work Mode

Work from Office

Job Type

Full Time

Job Description

Performance Measurement

  • RTV should be happen within 7 days from the date of part received at Jail area for Domestic Suppliers and within 14 days for Foreign vendors
  • Maintain APSYS levels as per site/global requirementw.r.t NCR management
  • NCR Cell needs to share and close 1 INR PO within a week and get acknowledgment
  • Vendor stock confirmation to be received quarterly and maintain 99.5% accuracy
  • NCR rework quote validation should be complete within7 days
  • Zero NC in Internal /External audits like IRIS/ANNUALSTOCK AUDIT etc.

Network & Links

Internal

  • Logistic Management, Logistics Engineering,
  • Warehouse Key User, Planning manager and Serial Production Coordinator (SPC), Material Planners
  • EHS, Indus, Manufacturing, GSI, Quality, Project, Finance, HR

External

  • Third Party Logistic (3PL), logistic partners, subcontractors, Suppliers

Responsibilities

  • Managing NCRs including stock management/return to vendor / replacement from supplier etc.
  • dentify Safety Abnormality (SOV)/ Near Miss, then Report and Provide corrective actions 24 no s / Year
  • Zero Incident and near miss in NCR process ( Packing, Loading / Unloading, RTV) IFR-1 = 0.4, TRIR
  • 309 NCR replacement parts issuance under First allotted location
  • Get the confirmation from suppliers for vendor stock asper the GSI every Quarter.
  • Reconcile the vendor stock and share the report to the management on quarterly.
  • Ensure and achieve 99.5% the Vendor stock accuracy
  • Escalate ageing more than 6 month cases to management. Review fortnight
  • NCR Cell needs to share and close 1 INR PO within a week and get acknowledgment
  • Ensure that the RTV should be happen within 7 days from the date of part received at Jail area (Domestic Suppliers)
  • Co-ornate with team for initiate the GR waiver and get it approved on time.
  • Ensure that the RTV should be happen within 14 days from the date of part received at Jail area (Foreign Suppliers).
  • NCR Value PO to be created on time for scrap sharepoint raised items.
  • Co-ordinate with Supplier and internal team for Childpart arrangement.
  • Ensure and co-ordinate with material planner for get back the parts with within 30 Days.
  • On time RTV processing with proper ageing tracker
  • APSYS audit (Line Feeding domain) Score Level 3(NCR targets)
  • IRIS audit (Warehouse domain) Zero NC
  • Annual external Audit for warehouse - Zero NC

Knowledge & Experience

  • Experience in Manufacturing organization with Warehouse operations and line feeding activity
  • 4 to 6 years experience in material management activities
  • Exposure in ERP system and SAP is mandatory
  • Procurement activities

Qualification

Engineering from a reputed institution

Competencies & Skills

  • Materials requirement planning
  • Supply chain information system - ERP/Sharepoint/etc.
  • Inventory management and production line feeding
  • Transportation
  • Quick reactivity on critical issues
  • Team Management
  • Process oriented
  • Problem solving
  • Entrepreneurship
  • Agility
  • Collaboration
  • Global Vision
  • Lean management

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now
Alstom Transportation logo
Alstom Transportation

Motor Vehicle Manufacturing

Saint-Ouen

RecommendedJobs for You

Sri Kalahasti, Andhra Pradesh, India