Posted:1 week ago|
Platform:
Work from Office
Full Time
1. Site Survey. Following are the Site Check Points Orientation of Building. Ceiling Heights - Floor to ceiling / slab Equipment Load Occupancy (Number of people) 2. Other Checks: Sprinklers/Fire pipes location Location of beam/Floor to Beam height Required Candidate profile Preparing the Electrical & Fire Fighting and Plumbing Shop drawing. Co-ordination with Architect,Consultant Candidate should be from Contracting HVAC Industry/MEP Contractor / Electrical Contractor
Triozone Mep Solutions
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
My Connections Triozone Mep Solutions
Mumbai, Thane
4.0 - 5.0 Lacs P.A.
8.5 - 9.5 Lacs P.A.
Surat
3.0 - 3.5 Lacs P.A.
Experience: Not specified
1.0 - 4.5 Lacs P.A.
Chennai, Thiruvananthapuram
8.0 - 15.0 Lacs P.A.
Hyderabad, Delhi / NCR, Mumbai (All Areas)
4.0 - 8.5 Lacs P.A.
0.2 - 0.5 Lacs P.A.
6.0 - 12.0 Lacs P.A.
2.25 - 3.0 Lacs P.A.
Junagadh
8.5 - 12.0 Lacs P.A.