Traffic Engineer

2 - 7 years

4 - 9 Lacs

Posted:7 hours ago| Platform: Naukri logo

Apply

Work Mode

Work from Office

Job Type

Full Time

Job Description

 
  1. Configure Optimized offsets (In consultation with Client Engineer, Traffic Police & O&M Site Team)
  2. Update and improve Plan Library including data from site and Adaptive operation of system
  3. Configure Expert Traffic Rules Editor as per requirement
  4. Link Calibration/ Validation
  5. Configure/Edit Green wave if required (In consultation with Traffic Police)
  6. Configure &/or modify ITACA systems components subarea/count site/link/ junction/ route

Review of ITACA System:

The brief scope of services that shall be provided are as below:

1. System Performance of ITACA

  • Fault analysis
  • System availability review
  • Detector performance review

2. Corridor management issues

  • Table synchronisation review
  • Sub area setup review
  • Optimisation of standalone tables

3. Operational Issues

  • Identification of issues in any particular junction (either manual handling or parking or phasing and timing, etc.)
  • Review of response time of the Maintenance Contractors
  • Issues in the maintenance of the system
  • Actions to be taken to improve the system

1. System Performance of ITACA

  • Fault analysis Area wise fault analysis (Island City, Western Suburb, Eastern Suburb) for all junctions shall be done on the basis of daily generated faults in FMS system & manually.
  • System availability review The review of Server, MTNL & Power Supply down time shall be done.
  • Detector performance review The performance review of Vehicle Detection camera shall be done on the basis of daily generated faults in FMS system.

2. Corridor management issues

  • Synchronisation review The review of synchronization (flow v/s cycle) of each sub area shall be taken based on historical data. Before review, junction plan & offset of all the junctions corresponding to that sub area shall be verified physically on site.
  • Sub area setup review -The review on sub area set up shall be verified physically on site.
  • Optimisation of standalone tables The junction parameters shall be physically verified at site location and same shall be conformed in ITACA system as mentioned below:

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now
Arcadis logo
Arcadis

IT Services and IT Consulting

Amsterdam Nederland

RecommendedJobs for You

mumbai metropolitan region

chennai, tamil nadu, india