Posted:1 day ago|
Platform:
On-site
Full Time
1. Manage site’s normal accounts,store & HR procedures through company software.
2 .Give respect and obedient to superiors as per company hirarchy in reporting and passing information and share better suggessions
3 .Follow prescribed company time schedule and send staff attendance by 7.30am to head office
4.Ensure labour entry at site sharp 7.45 am and collect attendance card.
5.Labour attendance should sent through company software before 8.30am
6. Ensure labour site attendance with attendance register
7. Attendance register has to be updated as per company instruction every morning
8. Follow ID card attendance checking system as per company instruction(04 times ina day)
9 . ISM data register and file should be followed effectively
10 .Update cash book daily
11 .Ensure better usage and proper maintenance of office equipements, site machinery and assets items provided at site
12 .Black oil apply has to be done to required machines and equipemnts on sundays by site watcher and its photos has to be sent to C.Store
13 .`All machines should be maintained well and covered with tarpaulins after use
14 .All documents related to machines has to be upadated daily
15 .Ensure better housekeeping and safety of workers
16 .Ensure all workers wearing safety PPE like safety helmet,belt ,shoe,googles etc at site and it has to be kept carefully after work, if not ,report
17 .Ensure whether there is any safety violations and report
18 .Visit labour quarters and report violations
19 .Don’t allow electrical consumption without sufficient industrial sockets
20 .Don’t allow use of electric wires laying down through floor
21 .Ensure that all joint of electric wires has covered carefully by insulation tape before its use
22 .Provide safety net on every two floors
23.Responsible for coordination and on time delivery of site requirements
24 .Ensure better site store with sufficient stock of materials
25 .Follow MR book effectively and make follow up with purchase and store authorities to deliver requirements on time
26 .Update inward ,outward,material stock registers
27 .Raw materials has to be stacked carefully in separate yards
28 .Vehicle measurement has to be done on delivery of raw matyerials and it has to be mentioned in GRN seal.
29 .Physical material stock should be checked with register
30 .Material issue from store should done in alloted time period and store room keys has to be kept at site office
31 .All material issue should be as per issue slip.
32 .Ensure QS's signature on all issue slips before issuing materials
33 .All PPE issues has to be entered in register and it has to be deducted from sub contractor account through billing dept
34 .Shuttering material wood/iron should be stacked carefully
35 .Ensure whether any suttering material wood/iron is misused carelessly and report
36 .All documents related to store has to be upadated daily
37 .`Issue of M.S nails should be done through nail box
38 .All local purchase bill approvals should be done through register
39 .All outside vehicle bill and company labour payment approvals should be done through register
40 .Submit inward register and outward register to project engineer for approving the loading ,unloading charges and bills
41 .Ensure signature of PE in weekly excess item details before sending to store
42 .Material supply under client scope should be cross cheked and duly signed by both client and site store engineer
43 .Keep excess ietms,damaged items,scrap items seperately
44 .Keep leveling stuff in cover and stack carefully
45 .Maintaining proper documents according to nature of work as per company instructions.
46 .Reporting to project engineer or concerned department head daily/weekly/monthly
47 .Works as per audit reports should correct within limited time and its reply should be given to higher authority with reason and corrective action
48 .Report repeated violations foundout in site to higher authority
49 .Findout and report raw material wastage due to carelessness.
50 .Ensure usage of crusher sand instead of concreting sand for bund making after concrete
51 .Provide separate space for disel storage and arrange extinguisher wherever it is required
52 .Arrange site watcher to remove scrap nails by magnet and return tools items to site store
53 .Arrange PPE box and stand given at site to stack safety belt & helmet carefully after use
Job Types: Full-time, Permanent
Pay: ₹20,000.00 - ₹30,000.00 per month
Benefits:
Ability to commute/relocate:
Work Location: In person
Application Deadline: 20/08/2025
Expected Start Date: 20/08/2025
VETTOOR CONSTRUCTION ENGINEERS PVT LTD
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
1.8 - 2.4 Lacs P.A.
Gota, Ahmedabad, Gujarat
1.8 - 2.4 Lacs P.A.
Kottayam, Kerala
Experience: Not specified
0.2 - 0.3 Lacs P.A.
Banūr
Experience: Not specified
2.4 - 3.6 Lacs P.A.
3.0 - 4.2 Lacs P.A.
Malumichampatti, Coimbatore, Tamil Nadu
3.0 - 4.2 Lacs P.A.
Banur, Punjab
Experience: Not specified
2.4 - 3.6 Lacs P.A.
kolkata, west bengal
Salary: Not disclosed
Pollāchi
Experience: Not specified
1.2 - 1.68 Lacs P.A.
Pollachi, Tamil Nadu
Experience: Not specified
1.2 - 1.68 Lacs P.A.