Production Manager

3 - 8 years

8 - 15 Lacs

Posted:8 hours ago| Platform: Naukri logo

Apply

Work Mode

Work from Office

Job Type

Full Time

Job Description

1.MIS updation, continuous updates through out the project with the support of engineering and ME.
2. Ensure alignment between DFMEA and PFMEA, Control plan, and drawings 3. Pre production and mass production control plan and quality check of alpha and Beta control plan 4.Ensures that parts shipped by the plant are meeting the specifications approved in TG0/TG1/TG2 etc 5.Supports project management in customer APQP requirements 6.Prepare initial PPAP by collecting relevant documents and verify submission 7.Moderates problem solving activities within project when 8D is required 8.Ensure that manufacturing release process is conducted in the well manner 9.Review and approve PPAP from the internal SQ Team 10.Actively participating in DFMEA and PFMEA 11.Verification of Lab test gauges and checking fixtures 12.Ensure Raw material in time for SOP and ensure functional effectiveness

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now
Tata AutoComp logo
Tata AutoComp

Automotive

Kolkata

RecommendedJobs for You