Hvac Project Engineer

6.0 - 10.0 years

8.0 - 15.0 Lacs P.A.

Mumbai

Posted:4 days ago| Platform: Naukri logo

Apply Now

Skills Required

Project EngineeringHvac Project EngineerBms SystemURSHVAC SystemPQHVAC EquipmentsOQIQHVAC EngineeringEquipment Validation

Work Mode

Work from Office

Job Type

Full Time

Job Description

Role & responsibilities MAJOR ACCOUNTABILITY (Mention core tasks assigned to associate etc.) 1. Preparation of Qualification documents for Pharmaceutical HVAC system. - URS, DQ, IQ, OQ, PQ 2. Execution of HVAC modification projects 3. Review of HVAC assessment reports for modification scope of HVAC systems 4. Review of BOQ for HVAC modification 5. Preparation of URS for Air Handling Systems 6. Preparation of QRA & CR for HVAC modification projects 7. Review of HVAC layouts i.e. System zoning, Pressure Zoning, Area Classification drawings 8. Review of Heat Load calculations 9. Integration of new AHUs with BMS system & BMS system qualification 10. Creation of Maintenance plan, Calibration plan for the HVAC systems 11. GMP & abiding and ensuring compliance to the Health, Safety & Environment policy. 12. Completion of all trainings assigned to role 13. Ensure integrity of data at workplace. 14. Ensure Good Documentation practices at workplace 15. Involvement in Detail Designing, Concept phase in Major/Minor Projects, Supervising and instructing third party contractor work 16. Weekly meeting with cross functional team to meet project timeline. 17. Daily startup meeting with team for complete project within timeline and to identify points which may impact on completion of project. 18. Vendor alignment to complete project timely and Vendor follow -up to timely resolve project problems 19. Handover area of equipment within define timeline to avoid process impact and Coordinate with cross functional team to complete project within timeline 20. Preparation of qualification document timely and Timely completion of project compliance action 21. Complete project within timeline with 21 CFR part 11 compliance and as per qualification sop. 22. Qualification documentation should prepare and execute with 100% accuracy without GXP error 23. All QMS actions should be completed within the assigned date. 24. Continuous improvement related to engineering to be initiate and complete at least 2 per year which will help to save R&M and time. 25. Installation and commissioning of FDF equipment as per GMP and Carrying out qualification activity as per SOP. Company : Sandoz Healthcare Location : Mumbai ( Kalwe ) Contract role and will be renewed yearly based share resumes to nedunuri.saikumar@manpower.co.in

RecommendedJobs for You