ENGINEERING DATA CONTROL

7 - 12 years

13 - 17 Lacs

Posted:-1 days ago| Platform: Naukri logo

Apply

Work Mode

Work from Office

Job Type

Full Time

Job Description

  • For the sack of a clear distinction between the two scopes, the task types are strictly divided into2 categories: tasks specific to EWP(Engineering Work Package) anticipation (EA) and tasks specific to TOP(Turn Over Package) anticipationCheck a Technical drawing or diagram together with the associated BoM and 3DCheck technical document using IO requirements and industrial best practices (eg
  • validation of standard representation of information, and/or technical aspect and/or project quality related)Check the overall technical document input of EWP productionCheck the overall drawing or diagram or BoM quality, and consistency with specific rules applicable for the TD type and EWP requirements (ISO standards & CAD manual & and ITER plant General plans & discipline dedicated drawings
  • TOP CAD deliverables performance analysis, Weekly provide performance analysis and status of TOP CAD deliverables, Monthly detailed activity report Yearly global report2D-3D Review related to
  • Manufacturing, Assembly & Installation for a given EWPo Provide industrial expertise to TRO or DO management in the frame of mechanical design, plant design, construction and operation, Produce dedicated EWP Documentation, Defining and documenting Process and Methodology dedicated to address specific EWP problematics
  • Preparation and support for Initial Report (deliverable) for a given EWP Preparation and support for Progress Report (deliverable) for a given EWP Preparation and support for Final Report (deliverable) for a given EWP Preparation and support for Produce dedicated TOP DocumentationInput Engineering Data applicability and completeness controlTo perform the control of the available of engineering data to be used as input forthe production of CAD data dedicated to
  • Operation,Corrective Actions for Input Engineering Data Completion Support the correction of the discrepancies reported by a TA2 activityControl of Operation CAD Data production outputsControl after their approval process that the CAD data produced specifically forOperation purposes meaning the CAD documents and their associated BOMs,including the mandatory properties of the listed equipmentReview of the on-site red-marks session reportsI
  • To review and assess the completeness and usability by the designers of the redmarksand annotation performed during site-visitsII
  • To request additional information and details to the site visit RO when necessaryfor the designer to be able to produce the corresponding update of the annotatedCAD documents"

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now

RecommendedJobs for You