Posted:1 week ago|
Platform:
Work from Office
Full Time
To lead the design and development of end-to-end Battery Energy Storage Systems (BESS), including integration with Power Conversion Systems (PCS), utilities, and renewable energy sources like solar and DG sets.
Career Tree Hr Solutions
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
15.0 - 25.0 Lacs P.A.
14.0 - 19.0 Lacs P.A.
25.0 - 27.5 Lacs P.A.
Mumbai
8.0 - 9.0 Lacs P.A.
9.0 - 14.0 Lacs P.A.
Bilaspur
1.0 - 6.0 Lacs P.A.
Experience: Not specified
1.25 - 4.0 Lacs P.A.
Experience: Not specified
2.16 - 4.2 Lacs P.A.
2.75 - 5.0 Lacs P.A.
Chennai, Bengaluru
15.0 - 30.0 Lacs P.A.