Posted:3 months ago|
Platform:
Work from Office
Full Time
Role & responsibilities Calculating Building Plinth Area, Construction Slab Area From Cad Drawings. Confirming Carpet Area And Sale Area Of Flats. Quantification Of Budgetary Job Quantity For Building , For Amenities, Services, Ground Development & Infrastructure Activities. Forwarding The Budgetary Estimate To Execution Team. Entering The Estimated Job Quantities In ERP System. Quantification Of Job Quantity For All floor work . Entering The Detailed / Revised Job Quantities For Sample Flat In ERP system. Rechecking / Quantification Of Job Quantity For Masonry, Plastering, Waterproofing, Flooring, Carpentry / Doors, Plumbing, Painting, Windows, Fabrication, Aluminium Works. Review The Estimated Cost Monthly On Highrise System. Monitoring Of Material Variance ( Theoretical Requirement Vs Actual Consumption ) In ERP Highrise System. Preferred candidate profile Verbal and written communication, including active listening for preparing reports. Mathematics for calculating material quantities and construction costs. Analytical thinking and problem-solving. Understanding of engineering science, construction and technology. Understanding of current building, health and safety regulations. Computer literacy and confidence using office and electronic project management programs.
Paranjape Schemes Construction
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
My Connections Paranjape Schemes Construction
Kolkata, West Bengal, India
Salary: Not disclosed
Mumbai, Maharashtra, India
4.0 - 7.0 Lacs P.A.
Hyderabad, Telangana, India
Salary: Not disclosed
Ernakulam, Kerala, India
Salary: Not disclosed
Chennai
3.0 - 4.75 Lacs P.A.
Mumbai, Maharashtra, India
Salary: Not disclosed
Thane, Navi Mumbai, Mumbai (All Areas)
4.0 - 8.0 Lacs P.A.
1.0 - 5.0 Lacs P.A.
Chennai
3.75 - 4.75 Lacs P.A.
1.0 - 3.25 Lacs P.A.