Posted:1 week ago|
Platform:
Work from Office
Full Time
Data Collection Onsite/Offsite Power System Protection Design Load Flow & Short Circuit Study Arc Flash Study Protection Device Coordination Study Simulation and Modeling ETAP Reporting and Documentation Knowledge of Power System Fundamentals
Elegrow Technology
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
My Connections Elegrow Technology
Experience: Not specified
1.5 - 3.0 Lacs P.A.
Ahmedabad, Chennai, Bengaluru
0.6 - 0.7 Lacs P.A.
Chennai
1.0 - 5.0 Lacs P.A.
Coimbatore
6.0 - 14.0 Lacs P.A.
Bengaluru
12.0 - 13.0 Lacs P.A.
Experience: Not specified
4.0 - 7.0 Lacs P.A.
Mumbai, Navi Mumbai
3.0 - 4.0 Lacs P.A.
Bangalore/Bengaluru
Experience: Not specified
3.0 - 6.0 Lacs P.A.
Hyderabad
4.0 - 8.0 Lacs P.A.
Ankleshwar, Surat
1.5 - 6.5 Lacs P.A.