7 - 10 years
7 - 15 Lacs
Posted:2 days ago|
Platform:
Work from Office
Full Time
• Experience in FRP cooling tower systems and rotating equipment.
• The role involves preparing GA, assembly, and fabrication drawings, developing BOMs, and creating fabrication-ready 2D/3D models using AutoCAD.
• The candidate should have hands-on experience in designing and detailing cooling tower components, axial and centrifugal fans, gear systems, and turbine components, including shafts, bearings, housings, and alignment details.
• Strong knowledge of FRP materials, metal fabrication, mechanical tolerances, and relevant industry standards is required.
Saaki Argus And Averil Consulting
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
7.0 - 15.0 Lacs P.A.
3.5 - 5.5 Lacs P.A.
6.0 - 10.0 Lacs P.A.
3.5 - 5.5 Lacs P.A.
20.0 - 25.0 Lacs P.A.
renigunta
6.0 - 10.0 Lacs P.A.
bengaluru
Experience: Not specified
1.92 - 2.64 Lacs P.A.
hyderabad
Experience: Not specified
1.5 - 3.0 Lacs P.A.
navi mumbai
5.0 - 7.5 Lacs P.A.
chennai
4.0 - 7.0 Lacs P.A.