Posted:5 days ago| Platform: Naukri logo

Apply

Work Mode

Work from Office

Job Type

Full Time

Job Description

Review and provide comments on the submitted GCs Quality Control Plan. Verify CLIENT inspection 105 requirements are complete and identify additional opportunities of improvement as appropriate. 106
1. Verify initial setup of Procore has the minimum:a. Creation and continuous management of Distribution Lists.b. Creation and continuous management of:1. Document Library2. Drawings3. Submittals4. Specifications5. Requests for Information (RFI)6. Test ReportsVerify all inspection checklists are loaded into Procore for all permanent equipment, materials, and Mechanical Electrical, Plumbing (MEP) systems. Verify MEP clash detection and deconfliction within the design has taken place and issues resolved.Construction Phase
1. Monitor GCs construction activities and log activities in a weekly report that outlines the following:a. Discrepancies/observations foundb. Change orders that were initialized due to qualityc. Progress and inspection photos.d. Project overall cleanliness and housekeeping efforts2. Verify all work in place confirms to contract documents. Verify and input discrepancies found in to Procore and note in the weekly report.3. Attend Owner, Architect, and Contractor (OAC) weekly meetings. One QA representative must physically attend meetings, other representatives may attend physically or virtually. Topics to be discussed during the OAC meeting are to include but not limited to:a. Status of Submittals.b. Status of outstanding issues/observations.c. Status of Requests for Information (RFI).4. In coordination with the GCs QC Plan, attend and provide input to the following meetings:a. QA/QC kick off meetingb. Regularly scheduled MEP meetingsc. Regularly scheduled QA/QC meetingsd. Regularly scheduled BIM and As-Built drawing meetings5. Continuous management of Procore. Verify the following information is up to date and correct:a. Document Libraryb. Drawings and As-Buildsc. Submittalsd. Specificationse. Requests for Information (RFI)f. Test Reportsg. Receipt Inspection Form (RIF)6. Continuous review and tracking of submittal register.7. Conduct review on RFI associated with Change Orders.a. Provide a report on the quantity and attributes of RFIs when the project crosses L3.b. Confirm all RFI's indicate if costs were identified when RFI was submitted by GC.c. Outline all RFIs which had a cost impact and identify if the RFI could have been mitigated 152 before the project award.8. Verify all critical equipment deliveries are damage free and match approved submittals. Ensure all findings are recorded in the CLIENT Receipt Inspection Form (RIF).9. Verify As-Built drawings have been created, regularly updated, and uploaded into Procore by the GC.10. Review test reports from testing agencies for contract conformance including but not limited to material testing of concrete, brick/mortar (if applicable), soil (type and compaction), asphalt, survey, electrical, communication etc.11. Assess GC means and methods for compliance with the most stringent requirement of applicable global, national, and local standards, and immediately notify CLIENT of any deficiencies.12. Witness Fire Protection and Fire Alarm Annunciation System Tests and confirm final settings are aligned with CLIENT setting policies.13. Verify MEP coordination and inspections have taken place to include but not limited to the following:a. MEP shop drawing reviewb. Upload of approved shop drawings in to Procorec. Deconflict any structural/electrical/plumbing collisionsd. Conduct rough in and field placement inspections of all MEP systemse. Ensure that access to valves, panels, doors etc. are maintained at all times.14. Verify proper cleaning of equipment and removal of Foreign Obstruction Debris (FOD) prior to any energizations or startup note any findings in the weekly report.15. Evaluate the proper levels of protection during construction for equipment and systems.16. Evaluate that the final installed product has been installed, checked inspected, and signed off, in order to 173 proceed into commissioning.17. Validate Pre-Commissioning inspections and identify deficiencies prior to Handoff to Commissioning (H2C) which include but not limited to:a. Mechanical flush, fill, and pressure inspections and reportsb. Equipment torque verifications and logsc. Phase rotation/energization inspectionsd. Equipment insulation and resistance inspectionse. Verify Short Circuit Coordination Studyf. Verify equipment labels (name and hazard) are properly labeled and placedg. Confirm FOD Inspections and cleaning of equipment is performed as outlined in the CLIENT 183 Checklist before any energizations or startup of equipment.D. Commissioning and Close Out Phase
1. Provide the client Commissioning (ACx) Team, client Controls Team, and the client Construction Manager a progress report identifying the following four weeks prior to H2Ca. Project Recap Reportb. Project Overall Schedule.c. Project Start-up Schedule.d. Open Procore Observation/Issues Log.e. Certificate of readiness log (COR).f. Status of project close out documents including as-builts and BIM.2. Review and provide comments on the GCs Close Out Binder which includes:a. Critical equipment Preventative Maintenance Manuals and Schedulesb. Warranty information for Equipment, materials, and building envelope3. Verify corrective actions for construction deficiencies are completed and recorded

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now

RecommendedJobs for You