Get alerts for new jobs matching your selected skills, preferred locations, and experience range. Manage Job Alerts
6.0 - 9.0 years
8 - 11 Lacs
Mumbai
Work from Office
PURPOSE OF THE JOB Provides field engineering leadership, assist and support to projects & PI team for investigation, troubleshooting and resolution of technical/quality issues MAIN RESPONSABILITIES Key accountabilities: Support any technical activity on Alstom products during PI period as well as Commissioning, Warranty (and Validation & Certification phase if applicable) Diagnoses cause of malfunction/failure of operational equipment and recommends preventative and corrective actions Define troubleshooting methodology Provides technical guidance and supports technicians in troubleshooting and repairs Provides feedback on technical documentation deficiencies. Advises PI management regarding customer satisfaction, product performance, and suggestions for product enhancements Drive Kx (8D) issues with Quality and internal & external Suppliers as support of Project Product Introduction Manager (PrPIM) Ensure completeness and quality of input to Failure Management data base for RAMS exploitation Drive Reliability Growth through failure/event investigation and reliability forecast implementation (with RAMS support). Drive and support containment to avoid reoccurrence of failures Supports as-maintained Alstom product configuration control and relevant documentation management Support technical reviews with internal and external Suppliers, partners, customers, authorities Ensure & facilitate information flow within the PI Customer Site, PI functions and project teams. Provides status and transparence on PI activities, key technical issues, to PrPIM. Apply EHS requirements on site with the support of EHS team representatives Drive technical Return of Experience/reporting/feedback as support of PrPIM Support Obsolescence Management (if applicable) Support preparation and implementation of Field Modifications (FM) Performance measurements: Achievement of contractual reliability (milestone) targets Achievement of contractual availability (milestone) targets Containment and solution of K1S/K2/K3 issues on time (Considering K1S safety relevant issue, K2 issue causing major passenger service disruption, K3 issue having impact on service availability and product reliability) Completeness and Quality of failure/event diagnosis/data and relevant documentation Reliability improvement after FM implementation Achievement of PI Dashboard Achievement of configuration updates Achievement of REX implementation Audit results (internal and external) Compliance with EHS rules and work-related processes MAIN REQUIRED COMPETENCES Educational Requirements Mandatory: Graduate in Engineering or Industrial Internal EHS training English Desirable: Masters degree in Engineering Experience Mandatory: Several years of technical experience, either mechanical or electrical / electronic engineering Railway safety & RAM EHS knowledge/exposure Product knowledge Data analytics Desirable: General Railway knowledge Field Experience Problem Solving skills DFQ, Quality and Audit skills Customer contact
Posted 2 days ago
5 - 10 years
7 - 12 Lacs
Hyderabad, Gurugram
Work from Office
Review and provide comments on the submitted GCs Quality Control Plan. Verify CLIENT inspection 105 requirements are complete and identify additional opportunities of improvement as appropriate. 106 1. Verify initial setup of Procore has the minimum: a. Creation and continuous management of Distribution Lists. b. Creation and continuous management of: 1. Document Library 2. Drawings 3. Submittals 4. Specifications 5. Requests for Information (RFI) 6. Test Reports Verify all inspection checklists are loaded into Procore for all permanent equipment, materials, and Mechanical Electrical, Plumbing (MEP) systems. Verify MEP clash detection and deconfliction within the design has taken place and issues resolved. Construction Phase 1. Monitor GCs construction activities and log activities in a weekly report that outlines the following: a. Discrepancies/observations found b. Change orders that were initialized due to quality c. Progress and inspection photos. d. Project overall cleanliness and housekeeping efforts 2. Verify all work in place confirms to contract documents. Verify and input discrepancies found in to Procore and note in the weekly report. 3. Attend Owner, Architect, and Contractor (OAC) weekly meetings. One QA representative must physically attend meetings, other representatives may attend physically or virtually. Topics to be discussed during the OAC meeting are to include but not limited to: a. Status of Submittals. b. Status of outstanding issues/observations. c. Status of Requests for Information (RFI). 4. In coordination with the GCs QC Plan, attend and provide input to the following meetings: a. QA/QC kick off meeting b. Regularly scheduled MEP meetings c. Regularly scheduled QA/QC meetings d. Regularly scheduled BIM and As-Built drawing meetings 5. Continuous management of Procore. Verify the following information is up to date and correct: a. Document Library b. Drawings and As-Builds c. Submittals d. Specifications e. Requests for Information (RFI) f. Test Reports g. Receipt Inspection Form (RIF) 6. Continuous review and tracking of submittal register. 7. Conduct review on RFI associated with Change Orders. a. Provide a report on the quantity and attributes of RFIs when the project crosses L3. b. Confirm all RFI's indicate if costs were identified when RFI was submitted by GC. c. Outline all RFIs which had a cost impact and identify if the RFI could have been mitigated 152 before the project award. 8. Verify all critical equipment deliveries are damage free and match approved submittals. Ensure all findings are recorded in the CLIENT Receipt Inspection Form (RIF). 9. Verify As-Built drawings have been created, regularly updated, and uploaded into Procore by the GC. 10. Review test reports from testing agencies for contract conformance including but not limited to material testing of concrete, brick/mortar (if applicable), soil (type and compaction), asphalt, survey, electrical, communication etc. 11. Assess GC means and methods for compliance with the most stringent requirement of applicable global, national, and local standards, and immediately notify CLIENT of any deficiencies. 12. Witness Fire Protection and Fire Alarm Annunciation System Tests and confirm final settings are aligned with CLIENT setting policies. 13. Verify MEP coordination and inspections have taken place to include but not limited to the following: a. MEP shop drawing review b. Upload of approved shop drawings in to Procore c. Deconflict any structural/electrical/plumbing collisions d. Conduct rough in and field placement inspections of all MEP systems e. Ensure that access to valves, panels, doors etc. are maintained at all times. 14. Verify proper cleaning of equipment and removal of Foreign Obstruction Debris (FOD) prior to any energizations or startup note any findings in the weekly report. 15. Evaluate the proper levels of protection during construction for equipment and systems. 16. Evaluate that the final installed product has been installed, checked inspected, and signed off, in order to 173 proceed into commissioning. 17. Validate Pre-Commissioning inspections and identify deficiencies prior to Handoff to Commissioning (H2C) which include but not limited to: a. Mechanical flush, fill, and pressure inspections and reports b. Equipment torque verifications and logs c. Phase rotation/energization inspections d. Equipment insulation and resistance inspections e. Verify Short Circuit Coordination Study f. Verify equipment labels (name and hazard) are properly labeled and placed g. Confirm FOD Inspections and cleaning of equipment is performed as outlined in the CLIENT 183 Checklist before any energizations or startup of equipment. D. Commissioning and Close Out Phase 1. Provide the client Commissioning (ACx) Team, client Controls Team, and the client Construction Manager a progress report identifying the following four weeks prior to H2C a. Project Recap Report b. Project Overall Schedule. c. Project Start-up Schedule. d. Open Procore Observation/Issues Log. e. Certificate of readiness log (COR). f. Status of project close out documents including as-builts and BIM. 2. Review and provide comments on the GCs Close Out Binder which includes: a. Critical equipment Preventative Maintenance Manuals and Schedules b. Warranty information for Equipment, materials, and building envelope 3. Verify corrective actions for construction deficiencies are completed and recorded
Posted 1 month ago
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
Accenture
16951 Jobs | Dublin
Wipro
9154 Jobs | Bengaluru
EY
7414 Jobs | London
Amazon
5846 Jobs | Seattle,WA
Uplers
5736 Jobs | Ahmedabad
IBM
5617 Jobs | Armonk
Oracle
5448 Jobs | Redwood City
Accenture in India
5221 Jobs | Dublin 2
Capgemini
3420 Jobs | Paris,France
Tata Consultancy Services
3151 Jobs | Thane