Posted:3 months ago|
Platform:
Work from Office
Full Time
The Piping Workface Planner is responsible for developing Installation work packages (IWPs), Test Work Packages (TWPs) for Piping installations in addition to being accountable for developing the detailed IWP release plan (90-Day schedule) with the Responsible superintendent, Responsible Field Engineer. The Pipingl Workface Planner will review general installation priorities and check to assure the work accomplished meets the project requirements. Reviews work scope, checking sequences, access, resources, equipment needs, pre-work, materials, and support services. The Piping Workface Planner prepares the scope of the IWP/TWP in coordination with piping field engineer to gain approval for the IWP/IWP. Workface Planner will perform random checking of IWP/TWP assembled by the other Workface planner. Understand work packaging philosophy, scope of installation, Work Breakdown Structure and scoping of installation work packages. Monitor project schedule and ensure performance and timely delivery of IWP/TWP; coordinate with Project Controls team, planners, other stakeholder of the project and ensure piping IWPs are issued as per the project priorities Monitor quality of IWP/TWP ensuring scoping and preparation of IWP/TWP is done right the first time Attend progress meetings, maintain effective interface with site management team, client s organization ensuring IWP/TWP, and advance work packaging efforts are effectively delivered on the project. Develops detailed IWPs/TWPs as per the project guidelines and procedures, which includes, compiling mechanical piping installation drawings, Isometrics, installation details, model snapshots, vendor drawings, inspection test records, flange connection datasheets or any other documents or Engineering deliverables associated with the IWPs/TWPs. Supports development of various other construction engineering deliverables like material takeoff of Piping bulk material and vendor supplied piping components and bulks; upload material take-off quantities and other attributes of Work Packages into the TEAMWorks database or project specific database. Preparation of work packages and method statement for module interconnects, field welds, removal of shipping supports, and other activities involved in installation of module. Preparation of IWP constrains list and assist in resolution and closure of constraints or engineering issues. Education and Experience Requirements: A recognized bachelor s degree in Mechanical Engineering (or international equivalent). Minimum experience of 10 yrs on Oil Gas industry or 15 to 20 years of relevant experience in lieu of a degree. Working experience at the jobsites as a Field Engineer or Construction Engineer on large industrial projects is essential. Required Knowledge and Skills: Experience in piping installation on large Oil Gas and Chemical projects sites Thorough knowledge of pipe installation and pipe testing at jobsites Shall have an experience of preparation of piping Installation work packages and Piping test work packages. Proficient in reading drawings, interpret design, specifications and industry standards and codes. Shall have a knowledge of ASME B31.3/B31.1 Excellent communications skills Proficient MS Office applications An experience of international field assignments is highly preferred.
Bechtel
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.