Posted:16 hours ago|
Platform:
Work from Office
Full Time
1. Transmission Line route finalisation, as per CEA Guideline
2. Detailed Survey and preparation of Profile, SLD and Tower Schedule
3. Optimisation of Route length, to minimise Quantity, ROW & Statutory Approvals
4. Ensure sec 68 Approval from MOP & CEA
5. Filing of Sec 164, PTCC & Statutory approval
6. Coordination with site team for Final CEIG / CEA Approval
H G Infra Engineering (HGIEL)
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
2.75 - 3.5 Lacs P.A.
2.75 - 3.5 Lacs P.A.
Bengaluru
9.0 - 10.0 Lacs P.A.
Hosur, Chennai
4.25 - 5.5 Lacs P.A.
Barmer
Experience: Not specified
2.4 - 3.6 Lacs P.A.
Valsad, Chitradurga, Aurangabad
0.5 - 1.75 Lacs P.A.
3.5 - 4.25 Lacs P.A.
6.0 - 11.0 Lacs P.A.
Alibag
4.0 - 7.5 Lacs P.A.