Posted:Just now|
Platform:
Work from Office
Full Time
To Prepare annual/monthly mine planning scheduling to execute monthly/daily blend plan to enable supply of right quality and quantity of Limestone / Clay / Laterite to stock piles and to implement scheme of prospecting, carry out investigation and calculate deposite reserves with its grade useful for making budget decisions and for making forecast, to ensure on time submission of monthly annual returns, daily royalty management other statutory obligations as required by Rule 55 of MCDR 2017.
Job Context: UltraTech Cement Ltd. is the largest manufacturer of grey cement, Ready Mix Concrete (RMC) and white cement in India. The company has consolidated capacity of 138.39 Million Tons Per Annum (MTPA)of grey cement. UltraTech Cement has 23 integrated plants, 1 clinkerisation plant, 29 grinding units and 8 bulk terminals.
Baga Cement Works was acquired by UltraTech Cement Limited from erstwhile M/S Jaiprakash Associated Limited in the year 2017. Baga Cement Works is located at around 155 Km from Chandigarh, 67 km from Shimla and 37 km from Bilaspur (HP). The nearest National Highway is NH88 which is 17 Km from the plant. The plant has 10,000 TPD clinker production capacity 250/300 TPH OPC/PPC cement grinding capacity. The preheater consists of four strings, each with 6 stages of LP cyclones, with two pyroclones supplied by M/s KHD. This is a unique feature of this cement plant due to which the plant operates at lower heat and electrical energy. The preheater has a height of 155 mtrs, with top floor at 135 mtrs. The preheater has been constructed out of tubular steel structure. The Cement Plant is based on lime stone deposits in Baga Bhalag hills which are adjacent to plant area. Limestone requirement of the plant is around 15000 TPD. For raw material grinding, two vertical roller mills of 420 TPH each have been installed with a C.F. Silo having a capacity of 24,000 MT. The unit is equipped with stateoftheart pollution control systems, and operating emission norms are much lower than the permissible standards of 30 mg/Nm3. Two continuous ambient air quality monitoring stations have been installed which are hooked up to CPCB and PCB and transmit real time datas. For emergency electrical power, 8 x 1800 KVA, DG sets have been installed. The township for the plant is located near the plant and has a residential complex for 300 families. 10+2 school and 30 bed hospital has been built. For transporting clinker and cement from plant a fleet of about 4000 trucks have been engaged. Major Challenges: Maintaining critical multiple parameters like Cao, Mgo LSF simulatanesously in limestone is biggest challenge for running of both the plants due to high variation in deposit quality laterally/horizontally. Deposit evaluation in clay mines Kharai block of ML2 as exploration drilling is not completed across full area.
Aditya Birla Insulators
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
6.0 - 8.0 Lacs P.A.
6.0 - 8.0 Lacs P.A.
7.0 - 12.0 Lacs P.A.
9.0 - 10.0 Lacs P.A.
30.0 - 35.0 Lacs P.A.
bawal, neemrana, manesar
12.0 - 20.0 Lacs P.A.
ahmednagar
4.5 - 8.0 Lacs P.A.
3.5 - 6.5 Lacs P.A.
18.0 - 24.0 Lacs P.A.
25.0 - 30.0 Lacs P.A.