Posted:1 day ago|
Platform:
Work from Office
Full Time
Should be cost estimations for Part and tooling including dies, Fixtures for Sheetmetal and Fabrication components for new developments and design changes. Part cost Estimations to be done at different stages of the project- Concept / Model based, Drawing based. Identify areas of cost reduction through design iteration to achieve the cost optimization at design stage itself. Study New existing manufacturing processes at supplier end to prepare Costing guidelines std estimation Templates. Qualifications B. Tech
Mahindra
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Mohali
12.0 - 13.0 Lacs P.A.
Bangalore Rural, Bengaluru
15.0 - 20.0 Lacs P.A.
8.0 - 12.0 Lacs P.A.
Bangalore Rural, Bengaluru
15.0 - 20.0 Lacs P.A.
Bengaluru
10.0 - 12.0 Lacs P.A.
50.0 - 100.0 Lacs P.A.
Experience: Not specified
4.0 - 8.0 Lacs P.A.
Bengaluru
11.0 - 16.0 Lacs P.A.
8.0 - 8.0 Lacs P.A.
15.0 - 20.0 Lacs P.A.