10 - 15 years
10 - 15 Lacs
Posted:16 hours ago|
Platform:
Work from Office
Full Time
Candidate must have electrical maintenance exposure of thermal power plant not less than 100 MW with good analytical approach & inbuilt problem solving capacity during professional challenges from core power plant maintenance team.
For BOP area:
Challenging acceptance attitude & cohesiveness among team
Hiranmaye Energy Limited
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
10.0 - 15.0 Lacs P.A.
5.0 - 6.0 Lacs P.A.
Mumbai, Navi Mumbai
4.0 - 5.0 Lacs P.A.
3.6 - 6.0 Lacs P.A.
Jaipur, VKI AREA JAIPUR, KISHANGARH AJMER
3.0 - 5.0 Lacs P.A.
Kishangarh, Jaipur
3.0 - 4.5 Lacs P.A.
10.0 - 15.0 Lacs P.A.
Bengaluru
6.0 - 7.0 Lacs P.A.
10.0 - 15.0 Lacs P.A.
7.0 - 10.0 Lacs P.A.