5 - 8 years
6 - 10 Lacs
Posted:2 weeks ago|
Platform:
Work from Office
Full Time
1) Leads the entire section during the shift.
2) Ensures safe start-up, steady running and shutdown of shredding & blending line;
3) Deploys operators and contract workers;
4) Supervises PCB identification, visual sorting, dismantling where needed (heatsinks, large copper, batteries, CRTs, etc.), and correct feeding of lines;
5) Verifies proper segregation of different PCB & e-waste categories;
6) Coordinates with mechanical & E&I supervisors for breakdowns;
7) Ensures log sheets, production and downtime data are updated;
8) Enforces PPE, lock-out and safe-work practices.
1) Responsible for reliability of all electrical and instrumentation systems in the section during the shift.
2) Ensures healthy status of HT/LT distribution, MCCs, DBs, lighting and earthing;
3) Monitors and troubleshoots VFDs for shredders, conveyors and blowers;
4) Ensures field instruments (weigh-bridges, belt scales, metal detectors, temperature / vibration / speed sensors, level switches) are working;
5) supports control-room in maintaining interlocks and safety circuits;
6) Performs routine checks on dust-collector fans and explosion-protection devices;
7) Supports commissioning, loop checks and change-management of PLC logic.
1) Owns mechanical health and availability of all pre-processing equipment in the shift.
2) Leads fitters / technicians and contractor teams;
3) Attends breakdowns and restores equipment safely;
4) Ensures proper alignment, tensioning and tracking of belts;
5) Oversees rotor / knife inspection & change in shredders;
6) Ensures spillage control, guards and chutes are intact;
7) Implements preventive maintenance as per plan;
8) Supports OEMs during commissioning, modifications and major overhauls;
9) Maintains consumption data for wear parts, lubricants and spares.
1) Authorised e-waste dismantlers, refurbishers and recyclers 2) Dry-waste Material Recovery Facilities and scrap-sorting facilities
3) Foundry / secondary metal units handling large volumes of scrap
4) Co-processing or solid-waste shredding facilities.
1) E-waste recyclers with mechanised lines
2) Muncipal Solid Waste, dry-waste, Material Recovery Facilities with conveyors & shredders
3) Cement / steel / mining plants with large material-handling & dust-collection systems
4) Any continuous plant with high density of small motors and VFDs.
1) Solid-waste shredding plants
2) Scrap-processing yards with balers and shredders
3) Cement, steel, mining plants with similar equipment
4) Any Indian e-waste dismantling unit that has started mechanisation.
Hindalco Industries
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
6.5 - 10.0 Lacs P.A.
jamnagar
3.0 - 4.2 Lacs P.A.
navi mumbai
3.0 - 3.5 Lacs P.A.
coimbatore
5.0 - 10.0 Lacs P.A.
1.0 - 3.0 Lacs P.A.
hyderabad
3.0 - 7.0 Lacs P.A.
pune, ahmedabad, mumbai (all areas)
Experience: Not specified
4.5 - 8.0 Lacs P.A.
jadcherla
1.25 - 5.0 Lacs P.A.
sikandrabad
5.0 - 7.0 Lacs P.A.
2.0 - 2.75 Lacs P.A.