4 - 6 years
4 - 7 Lacs
Hazira
Posted:1 week ago|
Platform:
Work from Office
Full Time
Preparation of 2D 3D drawings for Stack Component. Preparation of Engineering Drawings Technical Specification for Inhouse Outsource manufacturing for Stack Component. Selection of Boughtout Items Making Design Sizing Calculation. Review Approval of Boughtout items. Engineering for Facility Equipment s Stack Tilter, Trolley s, Tools for Facility. Preparation of Jigs Fixtures for Component manufacturing Assembly. Preparation of Assembly Procedure for Shop Activity. Layout Engineering for Facility. 3D Model Development for Electrolyser Componenet, Layout Engineering, Detail Engineering, Drawing drafting, Tool design for Electrolyser Manufacturing. Material Selection, Preparation of Specification for componenet procurement. Understanding of Electrolyser
L&T Technology Services (LTTS)
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
4.0 - 7.0 Lacs P.A.
Bengaluru
9.0 - 13.0 Lacs P.A.
Mumbai, Hyderabad, Bengaluru
7.0 - 12.0 Lacs P.A.
50.0 - 55.0 Lacs P.A.
Mumbai, Kurla
7.0 - 12.0 Lacs P.A.
9.0 - 13.0 Lacs P.A.
9.0 - 13.0 Lacs P.A.
Vadodara
Experience: Not specified
1.0 - 2.0 Lacs P.A.
Thoothukudi
1.0 - 4.0 Lacs P.A.
9.0 - 13.0 Lacs P.A.