Posted:2 weeks ago|
Platform:
Work from Office
Full Time
a) To ensure the 5S & Safety in the respective area. b) To update the Control Plan, PFMEA or any other relevant documents as per the action plan submitted for any customer complaint or customer audit. c) To prepare the PPAP documents in case of any ECN implemented. d) To get the NCRs closed properly, raised during the audits. e) To carry out the documentation related to EMS ISO 14001 : 2015 f) To ensure that shop floor documents (Work instructions, Quality Plan etc.) are properly displayed & adhered. g) To establish the required documentation of Quality system as per Standard IATF 16949:2016. h) To give at least one suggestion in a month to optimize the use of consumables, electricity & raw material by doing VE (Value Engineering). i) You are advised to present the Monthly Performance Report to the management on the basis of above mentioned points.
Kay Jay Forgings
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
5.0 - 6.0 Lacs P.A.
7.0 - 8.0 Lacs P.A.
4.0 - 7.0 Lacs P.A.
Hyderabad
6.0 - 10.0 Lacs P.A.
3.6 - 12.0 Lacs P.A.
4.0 - 9.0 Lacs P.A.
15.0 - 20.0 Lacs P.A.
3.5 - 4.75 Lacs P.A.
Dadra & Nagar Haveli
25.0 - 30.0 Lacs P.A.
3.0 - 6.0 Lacs P.A.