20 - 30 years
18 - 25 Lacs
Posted:2 days ago|
Platform:
Work from Office
Full Time
The Incumbent will be responsible for planning, execution, and commissioning of electrical systems for the Captive Power Plant (CPP). The role requires expertise in project management, electrical design, equipment selection, installation, testing, and ensuring timely execution as per quality, safety, and cost standards.
Manpower Resources India
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
18.0 - 25.0 Lacs P.A.
raipur
30.0 - 36.0 Lacs P.A.
18.0 - 25.0 Lacs P.A.
2.4 - 4.8 Lacs P.A.
1.0 - 2.0 Lacs P.A.
1.0 - 2.0 Lacs P.A.
ahmedabad
1.0 - 2.0 Lacs P.A.
1.0 - 2.0 Lacs P.A.
1.0 - 2.0 Lacs P.A.
ahmedabad
1.0 - 2.0 Lacs P.A.