Posted:1 month ago|
Platform:
Work from Office
Full Time
Coordination with Engineers and Supervisors for successful supply, Installation, Testing,
Basic Standard of Installation of Ducting, Piping and Insulation.
Basic Standard of Installation of Equipment like Chiller, Pump, AHU,Fan etc.
Basic Concepts of HVAC Design including Heat Load calculation, Selection of AHU
based on Load, Calculationof Piping/ Ducting Size based on GPM / CFM. Deep exposure to understand the different types of HVACSpecification.
Brigade Group
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
15.0 - 20.0 Lacs P.A.
2.25 - 6.5 Lacs P.A.
25.0 - 30.0 Lacs P.A.
4.0 - 8.0 Lacs P.A.
5.0 - 7.0 Lacs P.A.
5.0 - 7.0 Lacs P.A.
5.0 - 7.0 Lacs P.A.
mumbai, thane
7.0 - 12.0 Lacs P.A.
Experience: Not specified
3.75 - 4.0 Lacs P.A.
3.0 - 6.0 Lacs P.A.