Posted:2 months ago| Platform:
Work from Office
Full Time
the Coordinating(Estimation, contractors bills making & checking, Site material tests, indent quantity making , work order quantity making, costing, AutoCAD drawing making & editing, monthly project report making, and other works) Responsible for Drawing studying and analanalyzingysing. Quantity surveying (including BBS). Periodic progress review. Periodic reconciliation. Co-ordinating with client, ConConsultantssultant. Testing (Cube, Slum, Sieve analysis) & Maintain quality reports. Timtimelyely submission of all reports, sub-contractor measurements, inputs for client billing. Brick work & Plastering work B+G 9 (Site management, Estimation, Contractors bills, Site material tests, Quality control
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Mumbai, Bengaluru, Gurgaon
INR 32.5 - 37.5 Lacs P.A.
Chennai, Pune, Mumbai, Bengaluru, Gurgaon
INR 35.0 - 42.5 Lacs P.A.
Chennai, Pune, Delhi, Mumbai, Bengaluru, Hyderabad, Kolkata
INR 8.0 - 12.0 Lacs P.A.
Pune, Bengaluru, Mumbai (All Areas)
INR 0.5 - 0.7 Lacs P.A.
INR 2.5 - 5.5 Lacs P.A.
INR 3.0 - 4.5 Lacs P.A.
Bengaluru
INR 3.0 - 3.0 Lacs P.A.
Bengaluru
INR 3.5 - 3.75 Lacs P.A.
INR 2.5 - 3.0 Lacs P.A.
INR 4.0 - 4.0 Lacs P.A.