4 - 8 years
4 - 6 Lacs
Posted:9 months ago|
Platform:
Work from Office
Full Time
1. Implementation of production plan as per defined targets
2. Ensuring optimum output with minimal wastage & loss.
3. Ensuring maximum availability of machine up time.
1. Production : Ensure to Achieve Production as per business Plan Target. Minimize the cost for Production Process. Ensure to achieve desired yield as per Business Plan
2. Plan and Perform activity : Preparing weekly, daily production plan based other schedules released by PPC department. Preparing List of resource requirement. Collation of relevant information to be shared with the HOD. Ensuring adherence of production inline with specifications. Maintaining all records as required as per documentation as per organizational defined process and SOP. Recommend changes to be carried out to improve production. Carrying out routine health checkup of equipment's, to ensure continuity of operations.3. Drive initiative : Analysis and prepare actual production v/s Plan of schedule. Ensuring real time production is updated in SAP System. Ensure proper handling of SAP System and timely book production in System. Ensure timely booking of real time production in available system.
"1. Plan for reduction of Energy, Machine availability as per Defined Targets, ensuring cost optimization. 2. Rolling Mill Process 3. Resource planning man machine and material. 4. Safety of Man , machine and compliance to applicable safety standards "
Junior Management, Cross-Functional Collaboration ,Mid Management Experience Experience
Welspun Corp Limited
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.