3 - 5 years
4 - 7 Lacs
Posted:2 hours ago|
Platform:
Work from Office
Full Time
Responsible for designing HV systems (132kV GIS, transformers, surge arresters) and MV/LV systems (GIS, protection, metering, PQM, SCMS). Involved in design procedures, FAT, installation & commissioning. Experience with Oil & Gas standards preferred.
Elegrow Technology
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
Oman, Surat, United Arab Emirates
4.0 - 7.0 Lacs P.A.
3.0 - 4.5 Lacs P.A.
2.5 - 7.5 Lacs P.A.
Chennai
5.0 - 9.0 Lacs P.A.
Dubai, Chennai, United Arab Emirates
4.5 - 6.5 Lacs P.A.
Dubai, Chennai, United Arab Emirates
4.5 - 6.5 Lacs P.A.
Oman, Surat, United Arab Emirates
4.0 - 7.0 Lacs P.A.
Dubai, Chennai, United Arab Emirates
4.5 - 6.5 Lacs P.A.
Dubai, Chennai, United Arab Emirates
4.5 - 6.5 Lacs P.A.
16.0 - 27.5 Lacs P.A.