14.0 - 20.0 years
14.0 - 22.5 Lacs P.A.
Bhuj
Posted:2 hours ago| Platform:
Work from Office
Full Time
Role & responsibilities Method Study & Analysis of Manufacturing Process using MOST Tool Analysis of Process for NVA Reduction Production, Engineering, RMS, BSR Manpower Calculation as per Tonnage Norms Calculation according to Motion Study Set up / Changeover Time Study and reduce setup time by using tools like SMED & ECRS Material Handling Requirement Study (e.g.- Tow truck, Fork Lift) Ergonomics Study of work station & Layout Incentive Plan for Operators Cycle time Study of Man & Machine Preferred candidate profile B.E in Mechanical, M.S (Manufacturing Management), Industrial Engineering, Exposure in Handling Department of Industrial Engineering
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
14.0 - 22.5 Lacs P.A.
8.0 - 12.0 Lacs P.A.
20.0 - 27.5 Lacs P.A.
10.0 - 14.0 Lacs P.A.
6.0 - 10.0 Lacs P.A.
4.0 - 8.0 Lacs P.A.
14.0 - 22.5 Lacs P.A.
25.0 - 35.0 Lacs P.A.
10.0 - 20.0 Lacs P.A.
5.0 - 9.0 Lacs P.A.