3 - 5 years
3 - 5 Lacs
Posted:1 month ago|
Platform:
Work from Office
Full Time
Installation, Commissioning, Operation, Prevention and Breakdown Maintenance of water cooled chillers, cooling towers, Utility pumps, air Compressor, Exhaust Blowers, HVAC systems, Air Conditioning, Water Coolers, Air Handling Unit, Vacuum Pump. Required Candidate profile Candidate should have knowledge oof installation , commissioning, operation, prevention and Breakdown, Maintenance of Mechanical system in Pharma industry. Perks and benefits Birthday Leave, 28 PL, 5 Days working, Mediclaime
SITEC LABS
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
3.0 - 5.0 Lacs P.A.
Chennai, SIDCOThirumudivakkam
Experience: Not specified
1.5 - 4.25 Lacs P.A.
6.0 - 12.0 Lacs P.A.
Bengaluru
5.0 - 6.0 Lacs P.A.
5.0 - 6.0 Lacs P.A.
14.0 - 19.0 Lacs P.A.
7.0 - 12.0 Lacs P.A.
5.0 - 10.0 Lacs P.A.
Chennai
11.0 - 13.0 Lacs P.A.
Hazira
2.0 - 4.0 Lacs P.A.