Senior Manager - Electrical Projects

10 - 15 years

1 - 2 Lacs

Mundra

Posted:9 months ago

Apply

Job Description

Purpose/Objective


    This position is Senior Mab=nager & will be responsible for all aspects of Project installation and Site coordination of HT/LT Cable, Motors, Switch Gear, Panels, Transformers, Switch Yards, 11/33/66 KV substations, Input Voltage level to 220 KV then step down to other voltages, required a 22 KV substation of all major equipment for PolySi/ I&W/ Cell & Module/ Infrastructure Plant. The person should have hands on experience for Cell & Wafer Project to drive the Erection/ installation/ Commissioning work as per set targets with utmost safety and quality. He needs to coordinate with Contractors/ Consultant/ Engineering team and lead the site team for timely completion of the installation and commissioning work.

Key Responsibilities of Role


    Strategic Roles & Responsibilities 1. Erection, Testing & Commissioning of 66KV GIS and above switch yard with all associated equipment’s CB, CT, PT, CVT, Isolator, LA, Protection Relay, CRP Panel, RTCC, Power Transformer, SCADA, SAS, Battery Charger etc. 2. Testing, commissioning, Programming of protection relay & Trouble shooting. 3. Tripping Data analysis of various Electrical faults in electricall system. 4. Erection, Commissioning and testing of HT & LT Switchgear Panel, Fast Bus Transfer system,11kV RMU,11kV HT & LT Motor, NGR, Distribution transformer 11/0.433KV, PCC, MCC Panel, APFC Panel, AMF Panel & Synchronization system. 5. Erection, commissioning and testing of DG set & UPS system. 6. Erection, Commissioning and testing of PLC, SCADA based electrical system & trouble shooting. 7. Trouble shooting of large industrial utility system i.e. Air Compressor, AHU, VFD, HT/LT Motors/Water Treatment plant/HVAC/Gas Management system /VAM and its associated electrical system. 8. Effective Erection, Commissioning and Test of 11/33/66kV network & LT/HT Network of the plant. 9. Energy reports and MIS report preparation/checking 10. Spare parts and inventory management. 12. Preparation of SOP & E&C schedules, checking for proper adherence of PM schedule. 14. Safety awareness and implementation. 15. Familiar with HSE, QMS and Value Engineering. Technology and IT Enablement MS Office, SAP KRAs with Outcomes ( Jobs which brings value to the organisation) Domain Keys Result Ares Outcomes Electrical /Utility- Construction management (66kV GIS,11kV HT & LT Power network, MSTPL HT Network ) 1.Ensure uninterrrupted power supply during E&C of Cell & Module plants and its auxilairy equipments as per specified quality. 2. Adopt safe & Best Practices for E&C of Electrical equipments 3.Equipment maintenance analysis for effective operation and maintenance. 4.Harmonics Analysis in system and corrective measures & control with in specified limits 5 Protection Realy testing & parameterisation. Uninterrupted power supplies to all users. System reliability improvement 1. RCFA report preparation 2. System study & improvement planning 3. Followup & compliance of shutdown, pending jobs/modifications etc. Maintaining system service uptime Material management 1. Material mIn-max implementation 2. Creating PR & followup action for make the material at site 3. Checking for project electrical material requirements & action plan to make the same available at site Reduction of downtime due to lack of spares Organization Building and Development 1. Personal Development initiatives 2. Implementation of 5S & KAIZEN system 2. Create a culture of vibrant and motivated work atmosphere 3. Training of Contractor manpower & subordinate Establish and Develop a Strong Organisation and Teamwork. Safety practices improvement 1. Strict adherence of safety protocol 2. Steps for implementation of safe working practices 3. LOTO & PTW practice improvement Developing safe work environment and safe Working practices Stake Holders Internal External Management, Employees & Utility Users Government Bodies, Suppliers, Contractors & Society Competency Technical Competency ( To be filled by HM & HR ) Behavioural Competency Competency Desirable Competency Desirable Project Management Skills PL - 2 Strategic Orientation PL - 2 Development skills PL - 2 Entrepreneurial Mind-set PL - 2 Understanding of technical specifications of equipment PL - 2 Stakeholder Partnering PL - 2 Cost Estimation PL - 2 Outcome Orientation PL - 2 Team Building PL - 2 Transformation Focus PL - 2 Internal Stakeholder Management PL - 2 Innovation Focus PL - 2 Inspection & Testing Plan PL - 2 Team Orientation PL - 2 Employee Development PL - 2

Technical Competencies


    Electrical /Utility- Construction management ,System reliability improvement,Understanding of technical specifications of equipment ,Cost Estimation

Qualifications and Experience


    Educational Qualification: B. E / B. Tech Electrical Experience: Minimum 15 to 20 year

Skills Required

erection dg panels reliability lt ht mcc scada cost estimation construction management pcc switchgear substation gas construction project management development transformers data analysis power transformers sas plc commissioning site switchyard vfd troubleshooting ups

Work Mode

Work from Office

Job Type

Full Time

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now
coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now
Adani Group

Conglomerate

Ahmedabad

RecommendedJobs for You

Bhubaneswar, Nagpur, Pune, Ahmedabad, Jammu