1. Review wind plant & Hybrid plant level PSS/E models
2. Carry out Reactive power study.
3. Carry out Steady State & Dynamic data Base & Python+ Fortron Script coding for Pan India Projects.
4. Carrying out Grid code compliance studies & analysis of results
5. Carry out all the case studies based on CEA Grid connectivity compliance.
6. Validation of As built measurements, Preparation of reports.
7. Shall be strong in PSS/E simulation software.
8. Preparing the Simulation Report as per CEA/Grid India Guidelines.
9. Presenting the simulation studies to Grid authorities and get the Charging permission for wind farm/Hybrid Plant.
10. Trouble shooting of simulation models if any.
11. Carryout the Harmonics study of the wind plant and communicate the requirement of filters to Engg. Team
12. Attending various seminars & Grid India coordination meeting with regards to Grid Study.
Suzlon Group
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
Haryana
15.0 - 22.0 Lacs P.A.
Haryana
15.0 - 22.0 Lacs P.A.
12.0 - 15.0 Lacs P.A.
3.0 - 3.5 Lacs P.A.
5.0 - 8.0 Lacs P.A.
bengaluru
5.0 - 7.0 Lacs P.A.
3.6 - 4.08 Lacs P.A.
18.0 - 19.0 Lacs P.A.
16.0 - 17.0 Lacs P.A.
4.0 - 5.0 Lacs P.A.