Posted:3 months ago|
Platform:
Work from Office
Full Time
Role Description • Typical Work Scope includes following equipment: - • Pressure drop calculations for centrifugal & turbine pumps. • Pressure drop calculations for centrifugal & positive displacement blowers/compressors. • NPIP calculations for metering pumps. • Sizing calculations for HVAC units/systems. • Inquiry/TC/MFC of centrifugal pumps. • Inquiry/TC/MFC of turbine pumps. • Inquiry/TC/MFC of metering pumps/skids. • Inquiry/TC/MFC of blowers/compressors. • Inquiry/TC/MFC of mixers/agitators. • Inquiry/TC/MFC of any other rotary equipment. • Inquiry/TC/MFC of special packages like MBR/SBR, clarifiers, centrifuges, CLO2 system, HVAC etc. • Inquiry/TC/MFC of non-rotary process equipment (cartridge filters, heaters, heat exchanger etc.) • Inquiry/TC/MFC of specialty items (gates, ejectors, injectors etc.) • Inquiry/TC/MFC of manual valves. Roles and Responsibility Typical List & sequence of major activities (Primary Responsibility): - • Study of contract documents & preparation of Design Guide. • Preparation of MBO-Master BOQ. • Preparation of up-line documents/calculations required for inquiries of specific equipment. • Preparation, checking & releasing of Inquiry documents for all items in Master BOQ. • Preparation & publishing of Engineering Variance statement. • Receipt of offers from V1, V2 Vn as per contract approved vendor list (simultaneously or sequentially). • Evaluation of all offers & clarifying/resolving all the technical queries & issues. • Acceptance/rejection of technical deviations from contractual & value engineering aspects. • Issuance of Technical Clearance on all offers. • Preparation & release of technical comparison statement. • On PO placement and receipt of post-order documents from the selected vendor (OEM), evaluating those for technical integrity (w.r.t. technical clearance) and also evaluating additional detailed documentation. • Ensuring proper Interface Checking Getting comments from all disciplines involved & getting them resolved from the OEM. • Preparation of client submittals for all items, including spares, utilities, auxiliaries etc. as per contract approved Master Document List. • Interaction with client/consultant for getting approvals of all submitted documents. Visit/meet, if required for resolution of comments and getting quicker approvals. • Release of Manufacturing Clearance (MFC) on client approved documents. • Quick & timely exchange of technical information, updating documents, providing hold/release decisions during the entire cycle noted above. • Typical List & sequence of other activities (Secondary responsibilities): - • During initial stages, providing reasonably good/valid inputs to detail engineering team for preparation of layouts, mechanical GAs etc. Prepare, maintain the database for the same & extract the required information whenever required. • Receipt of observations from QA/QC inspector (after manufacturing) for various items & resolution thereof. Timely update of affected documents & re-approvals, if required, from client/consultant. • Receipt of various queries from site team during erection & commissioning of the plant & resolutions thereof. • Value engineering without affecting quality or performance of the equipment. • At the end of the project (post PGTR), update all the documents/calculations as As Built, within reasonable time, which need to be updated as per changes/modifications carried out for achieving PGTR.
WABAG
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
My Connections WABAG
6.0 - 14.0 Lacs P.A.