Get alerts for new jobs matching your selected skills, preferred locations, and experience range. Manage Job Alerts
10.0 - 16.0 years
12 - 14 Lacs
pune
Work from Office
Determination of salary structures, taxation, social securities, participation & review of policies from compliance and administrative perspective and sign off Enabling business teams to operate in a new country legitimately with the law Required Candidate profile Compliance Strategy-Key deliverables, compliance plan & control, functional manual, process documents, Risk & Change Managemet Drive or participate as an important key stake holder in large programs
Posted 1 week ago
10.0 - 16.0 years
12 - 14 Lacs
pune
Work from Office
Determination of salary structures, taxation, social securities, participation & review of policies from compliance and administrative perspective and sign off Enabling business teams to operate in a new country legitimately with the law Required Candidate profile Compliance Strategy-Key deliverables, compliance plan & control, functional manual, process documents, Risk & Change Managemet Drive or participate as an important key stake holder in large programs
Posted 1 week ago
7.0 - 12.0 years
9 - 10 Lacs
agar, gir, amreli
Work from Office
Lead, Supervise the WTG installation works, on-site QA walk down of installed and completed turbines, check of incoming goods Providing support for installation manager, ensure the QA standards are met, provide guidance to install contractors. Required Candidate profile Participates in LOTO process as required/directed Responsible for maintaining assigned vehicle in a responsible manner exp installation and mechanical completion of wind turbine generators Perks and benefits Accomodation, Cook, Traveling Reimbursement
Posted 1 week ago
7.0 - 10.0 years
15 - 18 Lacs
pimpri-chinchwad, pune
Work from Office
Assisting in budget preparation and financial forecasting for wind energy projects. Monitoring project financial performance and preparing regular reports for management review. Managing Accounts payable and receivable overall processes Required Candidate profile Conducting financial analysis to identify cost-saving opportunities and improve project profitability Identifying potential risks & implementing risk mitigation strategies to safeguard project assets
Posted 1 week ago
10.0 - 15.0 years
15 - 16 Lacs
mumbai, mumbai (all areas)
Work from Office
Detailed design of solar PV Plant Preparation of detailed plant BoQ and optimization, Solar Plant array layout and optimization DC, LT and HT cable sizing as per IEC code, Cable route layout and cable schedule PV yard earthing calculation and Design Required Candidate profile Preparation of DC and AC SLD Sizing of all electrical equipment of PV plant Preferred to have Hand on experience on PV case, Google sketch up Simulation technique - PVsyst Exp of Ground mounted - 1GW
Posted 1 week ago
3.0 - 8.0 years
5 - 7 Lacs
gir, amreli, dhar
Work from Office
Supervise the installation works, on-site QA walk down of installed and completed turbines, check of incoming goods Providing support for installation manager, ensure the QA standards are met, provide guidance to install contractors. MP & Gujarat Required Candidate profile Participates in LOTO process as required/directed Responsible for maintaining assigned vehicle in a responsible manner exp installation and mechanical completion of wind turbine generators Perks and benefits Acomodetion, Cook, Traveling Reimbursement
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
pune
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
gir
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
ahmedabad
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
noida
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
lucknow
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
mumbai
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
ranipet
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
junagadh
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
amreli
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
ahmednagar
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
bidar
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
bengaluru
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
belgaum
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
hubli
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
chandigarh
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
chennai
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
tirunelveli
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
17 - 18 Lacs
hyderabad
Work from Office
Analysis and development of wind resource meteorological files for use in simulation software: Windographer, WASP, Windfarmer, OpenWind and WindSim Analysis of energy production data from wind projects, Statistical Analysis of Long-Term Energy Yields Required Candidate profile Qualitative and quantitative data analysis Performance Analysis of WTGs, PV arrays, power electronic devices and electrical equipment based on recorded SCADA data. Technology and Design Optimisation Perks and benefits Sat-Sun Off, Flexi Hours, Global Work Exposure
Posted 1 week ago
3.0 - 8.0 years
5 - 7 Lacs
pune
Work from Office
Supervise the installation works, on-site QA walk down of installed and completed turbines, check of incoming goods Providing support for installation manager, ensure the QA standards are met, provide guidance to install contractors. MP & Gujarat Required Candidate profile Participates in LOTO process as required/directed Responsible for maintaining assigned vehicle in a responsible manner exp installation and mechanical completion of wind turbine generators Perks and benefits Acomodetion, Cook, Traveling Reimbursement
Posted 1 week ago
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
Accenture
81102 Jobs | Dublin
Wipro
28851 Jobs | Bengaluru
Accenture in India
24265 Jobs | Dublin 2
EY
21926 Jobs | London
Uplers
15950 Jobs | Ahmedabad
IBM
15060 Jobs | Armonk
Bajaj Finserv
14778 Jobs |
Amazon.com
14002 Jobs |
Accenture services Pvt Ltd
13694 Jobs |
Capgemini
13629 Jobs | Paris,France