6 - 8 years
3 - 7 Lacs
Korba, Raigarh, Bhilai/Bhillai, Raipur, Bilaspur
Posted:2 months ago|
Platform:
Work from Office
Full Time
Monitoring the safe and reliable operation of CFBC Boilers, Turbines, CHPs its auxiliaries of Thermal power plant WHRS. Accountable for maintaining and improving the plant efficiency, optimization of operational cost Shutdown Planning. MIS report preparation, Power Analysis, presentation preparation for various meetings, participation in award competitions. Strategic planning to reduce the auxiliary power consumption and plant heat rate. People development, collaboration and teamwork and effective utilization of manpower. Enforcement of all safety standards. Budget preparation Zero-based Budgeting in SAP, monitoring the TM1. Responsible for coal management and Its Analysis. Operation of STP and drinking water treatment Plant. Please go through above job description thoroughly and share your basic details only if your profile is relevant to position requirement, this will help us to screen your candidature: Click here to share some basic details Qualifications: Bachelor Of Technology,Diploma in Mech. Engg. Minimum Experience Level: 6-8 Years Report to: Senior General Manager
Aditya Birla Insulators
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Korba, Raigarh, Bhilai/Bhillai, Raipur, Bilaspur
3.0 - 7.0 Lacs P.A.