1. Parameters in revit
2. *MEP Works:* 1. *Mechanical Systems:* - What type of HVAC system is required (e.g., centralized, decentralized, VRV/VRF)? - Are there any specific mechanical system requirements (e.g., air quality, pressure)? 2. *Electrical Systems:* - What is the required power capacity for the project? - Are there any specific electrical system requirements (e.g., backup generators, UPS)? 3. *Plumbing Systems:* - What type of water supply system is required (e.g., municipal, well water)? - Are there any specific plumbing system requirements (e.g., water treatment, recycling)? *Civil Works:* 1. *Structural Systems:* - What type of foundation is required (e.g., shallow, deep)? - Are there any specific structural system requirements (e.g., seismic design, wind loads)? 2. *Architectural Finishes:* - What type of exterior cladding is required (e.g., brick, glass, metal)? - Are there any specific interior finish requirements (e.g., flooring, ceilings, walls)? 3. *Site Works:* - Are there any specific site preparation requirements (e.g., excavation, grading)? - Are there any environmental or sustainability considerations for the project?
3. Flushing method of chilled water and testing commission of hvac system
4. What is a Chilled Water System?
5. What interests you about this field?
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.