Posted:2 months ago| Platform:
Work from Office
Full Time
Process Flow Diagram, Preparation of Material & Energy Balance based on Process inputs/Lab Trial data, Process & Utility Equipment List Concept Study, P&IDs Utility Generation & Distribution Review of MDS, GA drawings, Nozzle Orientations Valve BOQ Required Candidate profile Equipment Sizing, Process & Utility Line Sizing, Pump,Exchanger Sizing,Safety Valve sizing, Control Valve Sizing, setting API, Chemical Manufacturing Facilities Concept, Basic Detail Engineering Work
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
15.0 - 18.0 Lacs P.A.